WO2024232773 - CONSTRUCTION FOR CASCADE HYDRO POWER PLANT
National phase entry is expected:
Publication Number
WO/2024/232773
Publication Date
14.11.2024
International Application No.
PCT/RS2024/000007
International Filing Date
09.05.2024
Title **
[English]
CONSTRUCTION FOR CASCADE HYDRO POWER PLANT
[French]
CONSTRUCTION POUR CENTRALE HYDRAULIQUE EN CASCADE
Applicants **
TESLA, Tomislav
Mose Pijade 20
21241 Kac-Novi Sad, RS
Inventors
TESLA, Tomislav
Mose Pijade 20
21241 Kac-Novi Sad, RS
Priority Data
P-2023/0357
11.05.2023
RS
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 963 | |
| EPO | Filing, Examination | 3598 | |
| Japan | Filing | 597 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 3910 |

Total: 9643 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
The construction for the installation of the Cascading Hydroelectric Power Plant in the very bed of the river was solved as follows: A base plate (6) is provided, on which the sill (7) is built. On both sides, a wall (4) is placed on the plate (6) and the threshold (7) for the fixed position of the Hydro Wing (8) and the arch (9) with the grid (10). This is how the difference in the height (17) of the water with the position of the Hydro Wing (8), under which the water (2) flows for the needs of the operation of the blades (15) of the turbine, is formed. The blades (15) of the turbine rotate around the Hydro Wings (8), arranged by the position of chains (29), guides (30) and rollers (31). The chain (29) rotates with the paddles (15) at the position of the sprocket (28) with the housings. Sensors (25) monitor the water level when the Hydro Turbine is automatically started or stopped with the help of the described assembly, when the vane (15) also serves as a valve (24) to stop the water flow. Everything needed for the production of electricity.[French]
La construction pour l'installation de la centrale hydroélectrique en cascade dans le lit de la rivière a été résolue comme suit : une plaque de base (6) est prévue, sur laquelle la traverse (7) est construite. Sur les deux côtés, une paroi (4) est placée sur la plaque (6) et le seuil (7) pour la position fixe de l'aile hydraulique (8) et de l'arc (9) avec la grille (10). Ainsi, la différence de hauteur (17) de l'eau avec la position de l'aile hydraulique (8), sous laquelle l'eau (2) s'écoule pour les besoins du fonctionnement des pales (15) de la turbine, est formée. Les pales (15) de la turbine tournent autour des ailes hydrauliques (8), disposées par la position des chaînes (29), des guides (30) et des rouleaux (31). La chaîne (29) tourne avec les palettes (15) à la position du pignon (28) avec les logements. Des capteurs (25) surveillent le niveau d'eau lorsque la turbine hydraulique est automatiquement démarrée ou arrêtée à l'aide de l'ensemble décrit, lorsque l'aube (15) sert également de soupape (24) pour arrêter le flux d'eau. Tout ce qui est nécessaire pour la production d'électricité.