WO2024246962 - PREHEATING AND MELTING SYSTEM FOR STEEL WITH DOUBLE MELTING FURNACE AND METHOD FOR PREHEATING AND MELTING STEEL USING A DOUBLE MELTING FURNACE
National phase entry is expected:
Publication Number
WO/2024/246962
Publication Date
05.12.2024
International Application No.
PCT/IT2024/050110
International Filing Date
29.05.2024
Title **
[English]
PREHEATING AND MELTING SYSTEM FOR STEEL WITH DOUBLE MELTING FURNACE AND METHOD FOR PREHEATING AND MELTING STEEL USING A DOUBLE MELTING FURNACE
[French]
SYSTÈME DE PRÉCHAUFFAGE ET DE FUSION POUR ACIER AVEC UN FOUR À DOUBLE FUSION ET PROCÉDÉ DE PRÉCHAUFFAGE ET DE FUSION D'ACIER À L'AIDE D'UN FOUR À DOUBLE FUSION
Applicants **
THERMOMELT SRL
Via Cefalonia 70
25124 Brescia, IT
Inventors
PICCOLO, Jacopo
Via Cefalonia 70
25124 Brescia, IT
Priority Data
102023000010776
29.05.2023
IT
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 959 | |
| EPO | Filing, Examination | 4635 | |
| Japan | Filing | 594 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 2710 |

Total: 9473 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A preheating and melting system for steel with a double melting furnace comprises a first and a second crucible for loading scrap (1), (2), a first and a second oxygen lance system equipped with a burner (3), (4), a mobile system of electrodes (5), a first and a second extractor hood system (6), (7), a first and a second flue (8), (9), a hot fume flue (12). When the first extractor hood system (6) is in operation, the second flue (9) is connected to the second extractor hood system (7), while when the second extractor hood system (7) is in operation, the first flue (8) is connected to the first extractor hood system (6). A method for preheating and melting steel involves a preheating and melting system for steel with a double melting furnace.[French]
L'invention concerne un système de préchauffage et de fusion pour acier avec un four à double fusion comprenant un premier et un second creuset pour charger des déchets (1), (2), un premier et un second système de lance à oxygène équipés d'un brûleur (3), (4), un système mobile d'électrodes (5), un premier et un second système de hotte aspirante (6), (7), un premier et un second carneau (8), (9), un carneau de fumées chaudes (12). Lorsque le premier système de hotte aspirante (6) est en fonctionnement, le second carneau (9) est relié au second système de hotte aspirante (7), tandis que lorsque le second système de hotte aspirante (7) est en fonctionnement, le premier carneau (8) est relié au premier système de hotte aspirante (6). Un procédé de préchauffage et de fusion d'acier comprend un système de préchauffage et de fusion pour acier avec un four à double fusion.