WO2025224515 - METHOD AND SYSTEM FOR PREDICTING RESOURCE LOAD IN INDUSTRIAL CONTROL SYSTEMS
National phase entry is expected:
Publication Number
WO/2025/224515
Publication Date
30.10.2025
International Application No.
PCT/IB2025/051816
International Filing Date
20.02.2025
Title **
[English]
METHOD AND SYSTEM FOR PREDICTING RESOURCE LOAD IN INDUSTRIAL CONTROL SYSTEMS
[French]
PROCÉDÉ ET SYSTÈME DE PRÉDICTION DE CHARGE DE RESSOURCES DANS DES SYSTÈMES DE CONTRÔLE INDUSTRIELS
Applicants **
ABB SCHWEIZ AG
Inventors
PP, Abdulla
SCHOCH, Nicolai
JETLEY, Raoul
KARLEKAR, Sunil
Priority Data
202441032804
25.04.2024
IN
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2121 | |
| EPO | Filing, Examination, Granting | 9637 | |
| Japan | Filing, Examination, Granting | 2246 | |
| South Korea | Filing, Examination, Granting | 2254 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
20,998
Contact Us
Abstract[English]
The present disclosure relates to a method of predicting resource load in Industrial Control Systems (ICS). The method comprises receiving input configuration data associated with at least one of, a control system intended to be deployed or an application deployable for a component associated with the control system. Further, the method comprises predicting a resource load of the at least one of, the control system or the application. The resource load is predicted based on the input configuration data, by using an approximation model representing a predetermined functional relationship between historical input parameters comprising one or more attributes of a deployed control system and corresponding resource loads.[French]
La présente divulgation concerne un procédé de prédiction de charge de ressources dans des systèmes de contrôle industriels (ICS). Le procédé consiste à recevoir des données de configuration d'entrée associées à au moins l'un parmi un système de contrôle destiné à être déployé ou une application déployable pour un composant associé au système de contrôle. En outre, le procédé consiste à prédire une charge de ressources de l'au moins un parmi un système de contrôle et/ou une application. La charge de ressources est prédite sur la base des données de configuration d'entrée, en utilisant un modèle d'approximation représentant une relation fonctionnelle prédéterminée entre des paramètres d'entrée historiques comprenant un ou plusieurs attributs d'un système de contrôle déployé et des charges de ressources correspondantes.