WO2025202739 - RESOURCE REQUIREMENT DETERMINATION METHOD, RESOURCE ALLOCATION METHOD, AND ELECTRONIC DEVICE
National phase entry is expected:
Publication Number
WO/2025/202739
Publication Date
02.10.2025
International Application No.
PCT/IB2025/051431
International Filing Date
12.02.2025
Title **
[English]
RESOURCE REQUIREMENT DETERMINATION METHOD, RESOURCE ALLOCATION METHOD, AND ELECTRONIC DEVICE
[French]
PROCÉDÉ DE DÉTERMINATION DE BESOIN EN RESSOURCE, PROCÉDÉ D'ATTRIBUTION DE RESSOURCE ET DISPOSITIF ÉLECTRONIQUE
[Chinese]
资源需求确定方法、资源分配方法和电子设备
Applicants **
CLOUD INTELLIGENCE ASSETS HOLDING (SINGAPORE) PRIVATE LIMITED
Inventors
ZHUANG, Yu
TIAN, Shuangkun
LI, Peng
Priority Data
202410384555.4
29.03.2024
CN
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
IPOS
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1956 | |
| EPO | Filing, Examination, Granting | 11558 | |
| Japan | Filing, Examination, Granting | 1721 | |
| South Korea | Filing, Examination, Granting | 1206 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
21,181
Contact Us
Abstract[English]
Embodiments of the present disclosure provide a resource requirement determination method, a resource allocation method, and an electronic device. The resource requirement determination method comprises: determining one or more sub-tasks included in an offline workflow; for any target sub-task among the one or more sub-tasks, on the basis of description information of the target sub-task, determining a preset number of historical sub-tasks similar to the target sub-task, wherein the description information is used to characterize attributes of the target sub-task and a dependency relationship between the target sub-task and other sub-tasks; and on the basis of actual resource consumption values of the preset number of historical sub-tasks, determining a resource requirement of the target sub-task, and, on the basis of the resource requirement of the target sub-task, generating and running the target sub-task. The method avoids excessively long offline workflow runtime, offline workflow failures, or resource waste caused by improper resource requirement settings.[French]
Des modes de réalisation de la présente divulgation concernent un procédé de détermination de besoin en ressource, un procédé d'attribution de ressource et un dispositif électronique. Le procédé de détermination besoin en ressource consiste à : déterminer une ou plusieurs sous-tâches incluses dans un flux de travaux hors ligne ; pour toute sous-tâche cible parmi la ou les sous-tâches, sur la base d'informations de description de la sous-tâche cible, déterminer un nombre prédéfini de sous-tâches historiques similaires à la sous-tâche cible, les informations de description étant utilisées pour caractériser des attributs de la sous-tâche cible et une relation de dépendance entre la sous-tâche cible et d'autres sous-tâches ; et sur la base de valeurs de consommation de ressources réelles du nombre prédéfini de sous-tâches historiques, déterminer un besoin en ressource de la sous-tâche cible, et, sur la base du besoin en ressource de la sous-tâche cible, générer et exécuter la sous-tâche cible. Le procédé évite un temps d'exécution de flux de travaux hors ligne excessivement long, des défaillances de flux de travaux hors ligne, ou des gaspillages de ressources provoqués par des réglages de besoin en ressources incorrects.[Chinese]
本公开实施例提供了资源需求确定方法、资源分配方法和电子设备。该资源需求确定方法包括:确定离线工作流包含的一个或多个子任务;针对一个或多个子任务中任一目标子任务,基于目标子任务的描述信息,确定与目标子任务相似的预设数量个历史子任务,描述信息用于表征目标子任务的属性以及目标子任务与其他子任务的依赖关系;基于预设数量个历史子任务的真实资源消耗值,确定目标子任务的资源需求,并基于目标子任务的资源需求生成和运行目标子任务。该方法避免了由于资源需求设置不当导致离线工作流运行时间过长、离线工作流失败或者导致资源浪费。