WO2025027413 - PREDICTION OVERLAPPED WITH MEASUREMENT REPORTING

National phase entry:
Publication Number WO/2025/027413
Publication Date 06.02.2025
International Application No. PCT/IB2024/056292
International Filing Date 27.06.2024
Title **
[English] PREDICTION OVERLAPPED WITH MEASUREMENT REPORTING
[French] PRÉDICTION CHEVAUCHÉE AVEC RAPPORT DE MESURE
Applicants **
NOKIA TECHNOLOGIES OY
Inventors
SANGUANPUAK, Tachporn
VOOK, Frederick
AHMADIAN TEHRANI, Amir Mehdi
LADDU, Keeth Saliya Jayasinghe
BONFANTE, Andrea
Priority Data
63/517,021   01.08.2023   US
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2400
EPO Filing, Examination, Granting12723
Japan Filing, Examination, Granting2401
South Korea Filing, Examination, Granting2575
USA Filing, Examination, Granting7740
MasterCard Visa
Total: 27,839

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Contact Us
Abstract[English] Example embodiments of the present disclosure relate to methods, devices, apparatuses and computer readable storage medium of prediction overlapped with measurement reporting. In a method, a first apparatus, receives, from a second apparatus, a configuration of at least one prediction time window for generating an outcome of a prediction from a model. The first apparatus determines, based on the configuration, a time period over which the at least one prediction time window overlaps with at least one observation time window for a measurement associated with the prediction. The first apparatus transmits, to the second apparatus, at least one report of the measurement obtained within the time period and at least one outcome of the prediction generated from the model within the time period.[French] Des exemples de modes de réalisation de la présente invention concernent des procédés, des dispositifs, des appareils et un support de stockage lisible par ordinateur de prédiction chevauchée avec un rapport de mesure. Dans un procédé, un premier appareil reçoit, en provenance d'un second appareil, une configuration d'au moins une fenêtre temporelle de prédiction pour générer un résultat d'une prédiction à partir d'un modèle. Le premier appareil détermine, sur la base de la configuration, une période de temps sur laquelle la ou les fenêtres temporelles de prédiction chevauchent au moins une fenêtre temporelle d'observation pour une mesure associée à la prédiction. Le premier appareil transmet, au second appareil, au moins un rapport de la mesure obtenue dans la période de temps et au moins un résultat de la prédiction générée à partir du modèle dans la période de temps.