WO2025202681 - DRILLED PILE ANCHOR AND METHOD

National phase entry:
Publication Number WO/2025/202681
Publication Date 02.10.2025
International Application No. PCT/IB2024/052909
International Filing Date 26.03.2024
Title **
[English] DRILLED PILE ANCHOR AND METHOD
[French] ANCRAGE DE PIEU FORÉ ET PROCÉDÉ
Applicants **
NOBLE DRILLING A/S
Inventors
ABERCROMBIE, Jeremy
BERTELSEN, Bjarne
HANSEN, Kristian
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2001
EPO Filing, Examination, Granting9148
Japan Filing, Examination, Granting2243
South Korea Filing, Examination, Granting2047
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 20,179
Contact Us
Abstract[English] A method for setting an anchor pile includes moving a mobile offshore drilling unit (MODU) such that at least one hoist unit in the MODU is disposed over a water bottom location for setting the anchor pile. A hole is drilled through the water bottom for receiving the anchor pile. A drill string and bottom hole assembly (BHA) used to drill the hole are removed. The anchor pile is extended into the hole; Cement is pumped through a cementing string extended from the MODU and through the anchor pile. The cementing string is disconnected from the anchor pile. After the cement is cured, tension is applied from a line or string extended from the MODU to test mooring strength of the anchor pile.[French] La présente invention concerne un procédé de réglage d'un pieu d'ancrage comprenant le déplacement d'une unité de forage en mer mobile (MODU) de telle sorte qu'au moins une unité de levage dans la MODU est disposée sur un emplacement de fond d'eau pour régler le pieu d'ancrage. Un trou est percé dans le fond d'eau pour recevoir le pieu d'ancrage. Un train de tiges de forage et un ensemble de fond de trou (BHA) utilisés pour forer le trou sont retirés. Le pieu d'ancrage est étendu dans le trou ; du ciment est pompé à travers une chaîne de cimentation s'étendant à partir de la MODU et à travers le pieu d'ancrage. La chaîne de cimentation est déconnectée du pieu d'ancrage. Une fois le ciment durci, une tension est appliquée à partir d'une ligne ou d'une corde étendue à partir de la MODU pour tester la force d'amarrage du pieu d'ancrage.

Rejoining the server...