WO2024246597 - ESTIMATING A CONFIGURATION OF CHARGING INFRASTRUCTURE FOR VEHICLE FLEETS

National phase entry is expected:
Publication Number WO/2024/246597
Publication Date 05.12.2024
International Application No. PCT/IB2023/058943
International Filing Date 09.09.2023
Title **
[English] ESTIMATING A CONFIGURATION OF CHARGING INFRASTRUCTURE FOR VEHICLE FLEETS
[French] ESTIMATION D'UNE CONFIGURATION D'INFRASTRUCTURE DE CHARGE POUR FLOTTES DE VÉHICULES
Applicants **
DAIMLER TRUCK AG, GERMANY Fasanenweg 10 70771 Leinfelden-Echterdingen, DE
Inventors
KULSHRESTHA, Shlok c/o Daimler Truck AG, Germany Fasanenweg 10 70771 Leinfelden-Echterdingen, DE
MUNIRAJAPPA, Chandrashekara c/o Daimler Truck Innovation Center India Whitefield Palms, Plot 9&10 Whitefield Main Road Bengaluru, Karnataka 560066, IN
SHRIVASTAVA, Himanshu Daimler Truck Innovation Center India Plot No. 9 /10, Whitefield Palms, KIADB Export Area Whitefield, Bengaluru, 560066, IN
SALAH EL DIN, Florian c/o Daimler Truck AG, Germany Fasanenweg 10 70771 Leinfelden-Echterdingen, DE
VEDULA, Sashank CORPI, 4747 N. Channel Ave Portland, OR 97217, US
PRASAD, Slilpa P. Daimler Truck Innovation Center Whitefield Main Rd, Whitefield, EPIP Zone, Bengaluru, Karnataka 560066, IN
VIJAYARAGHAVAN, Satish CORPI, 4747 N. Channel Ave Portland, OR 97217, US
AGASHE, Shrirang c/o Daimler Truck Innovation Center India PVT. LTD. Whitefield Palms, Plot No. 9 & 10, Whitefield Main Rd, Opposite Satya Sai Hospital Bengaluru, Karnataka 560066, IN
KANNAPPAN, Pazhanivel c/o Daimler Truck AG, Germany Fasanenweg 10 70771 Leinfelden-Echterdingen, DE
Priority Data
202311037742   01.06.2023   IN
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1446
EPO Filing, Examination6748
Japan Filing590
South Korea Filing575
USA Filing, Examination2710
MasterCard Visa

Total: 12069

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] The present disclosure provides systems and methods for determining configurations for charging infrastructure for vehicle fleets based on received user inputs and estimated load demand. The disclosed examples include carrying out a probabilistic load simulation for a number of vehicles in the fleet to determine a probabilistic load demand. Further, the disclosed examples include obtaining one or more inputs associated with the charging infrastructure and associated configuration settings, and then mapping the one or more obtained inputs with the determined probabilistic load demand. The disclosed examples further include carrying out optimization of the charging infrastructure taking into consideration the obtained one or more obtained inputs that are mapped with the determined probabilistic load demand.[French] La présente invention concerne des systèmes et des procédés pour déterminer des configurations pour une infrastructure de charge pour des flottes de véhicules sur la base d'entrées d'utilisateur reçues et d'une demande de charge estimée. Les exemples décrits comprennent la réalisation d'une simulation de charge probabiliste pour un certain nombre de véhicules dans la flotte pour déterminer une demande de charge probabiliste. En outre, les exemples décrits consistent à obtenir une ou plusieurs entrées associées à l'infrastructure de charge et des paramètres de configuration associés, puis à mapper la ou les entrées obtenues avec la demande de charge probabiliste déterminée. Les exemples décrits comprennent en outre la réalisation d'une optimisation de l'infrastructure de charge en prenant en considération la ou les entrées obtenues qui sont mappées avec la demande de charge probabiliste déterminée.
An unhandled error has occurred. Reload 🗙