WO2024003771 - ADAPTIVE BATTERY POWER CONTROL DURING HYBRID POWERED WELDING
National phase entry is expected:
Publication Number
WO/2024/003771
Publication Date
04.01.2024
International Application No.
PCT/IB2023/056683
International Filing Date
28.06.2023
Title **
[English]
ADAPTIVE BATTERY POWER CONTROL DURING HYBRID POWERED WELDING
[French]
COMMANDE ADAPTATIVE DE PUISSANCE DE BATTERIE PENDANT UN SOUDAGE À ALIMENTATION HYBRIDE
Applicants **
ESAB AB
Lindholmsallén 9
Box 8004
402 77 Gothenburg, SE
Inventors
SHANMUGAM, Paramasivam
F1 KGR Mahadev Apartments
Vembuli Amman Koil Street
K.K. Nagar (West)
Chennai 600078, IN
LOWTHER, Mark
10 Lapwing Close, Lowton
Warrington, Cheshire WA3 2GU, GB
RENGAMUNI, Govarthanan
S11, Surana Enclave, Moovendar Nagar Extn. Old Perungalathur
Tamil Nadu State
Chennai 600063, IN
SELVAKUMAR, Sankar
No 11, Kandhaswamy, 1st Street
Tandurai, Pattabiram
Chennai 600072, IN
Priority Data
202241037355
29.06.2022
IN
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 1231 | |
| EPO | Filing, Examination | 6356 | |
| Japan | Filing | 592 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 2635 |

Total: 11389 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A method of operating a hybrid power supply includes supplying to a power source, from a first energy source, power for a welding or a cutting process, selectively supplying to the power source, from a second energy source, supplementary power for the welding or the cutting process, and controlling an amount of the supplementary power that is supplied for the welding or the cutting process based on at least one of (a) a circuit breaker value of a circuit breaker arranged as a safety device in the first energy source (b) a voltage level presented by the first energy source, and (c) an output current setting of the power source.[French]
Un procédé de commande d'une alimentation hybride comprend la fourniture à une source d'alimentation, à partir d'une première source d'énergie, d'une puissance pour un processus de soudage ou de coupe, la fourniture sélective à la source d'alimentation, à partir d'une seconde source d'énergie, d'une puissance supplémentaire pour le processus de soudage ou de coupe, et la commande d'une quantité de la puissance supplémentaire qui est fournie pour le processus de soudage ou de coupe sur la base d'au moins l'un parmi (a) une valeur de disjoncteur d'un disjoncteur agencé en tant que dispositif de sécurité dans la première source d'énergie, (b) un niveau de tension présenté par la première source d'énergie et (c) un réglage de courant de sortie de la source d'alimentation.