WO2024261523 - FLOATABLE VILLA
National phase entry is expected:
Publication Number
WO/2024/261523
Publication Date
26.12.2024
International Application No.
PCT/IB2023/056531
International Filing Date
23.06.2023
Title **
[English]
FLOATABLE VILLA
[French]
VILLA FLOTTANTE
Applicants **
HONARVAR, Mehdi
Maliabad street
Shiraz, 7187644768, IR
Inventors
HONARVAR, Reza
Mali abad street
Shiraz, 7187644768, IR
HONARVAR, Sam
Mali Abad
Shiraz, 7187644768, IR
HONARVAR, Javad
mali Abad
Shiarz, 7187644768, IR
HONARVAR, Pouya
Mali abad
Shiraz, 7187644768, IR
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
IP India
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 893 | |
| EPO | Filing, Examination | 4862 | |
| Japan | Filing | 589 | |
| South Korea | Filing | 482 | |
| USA | Filing, Examination | 6910 |

Total: 13736 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
In this invention, a dual purpose house is designed which is located on the ground But it has the potential to float when there is a danger (danger of flooding or rising sea water). This ability has brought about the complexity of the structure. During several years of research, I have designed the structure in such a way that it can be 100% like normal buildings but retain the potential to float.These houses actually have vertical movements during floods in the direction of 4 or 6 marine piles that are built around them. Floating is done by the basic force of water, and the return of houses to their previous position is done by the force of earth's gravity. Therefore, it does not consume any energy in this case.[French]
La présente invention porte sur la conception d'une maison à double usage, qui est située sur le sol mais qui a la capacité de flotter en cas de danger (risque d'inondation ou d'élévation du niveau d'eau de mer). Cette capacité a entraîné une complexité dans la structure. La structure a été conçue après plusieurs années de recherche, de manière à ce qu'elle soit entièrement semblable aux bâtiments classiques, tout en conservant la capacité de flotter. Ces maisons présentent en réalité des mouvements verticaux lors des inondations, dans la direction de 4 ou 6 pieux marins construits autour d'elles. Le flottement est effectué par la force de base de l'eau, et le retour des maisons à leur position précédente est effectué par la force de la gravité terrestre. Par conséquent, ces maisons ne consomment pas d'énergie dans ce cas.