WO2023209579 - METHOD FOR VERIFYING FLOW COMPLETION TIMES IN DATA CENTERS

National phase entry:
Publication Number WO/2023/209579
Publication Date 02.11.2023
International Application No. PCT/IB2023/054266
International Filing Date 26.04.2023
Title **
[English] METHOD FOR VERIFYING FLOW COMPLETION TIMES IN DATA CENTERS
[French] PROCÉDÉ DE VÉRIFICATION DE TEMPS D'ACHÈVEMENT DE FLUX DANS DES CENTRES DE DONNÉES
Applicants **
AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE, LIMITED
Inventors
RAICIU, Costin
Priority Data
17/731,417   28.04.2022   US
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1962
EPO Filing, Examination, Granting8115
Japan Filing, Examination, Granting2120
South Korea Filing, Examination, Granting1899
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 18,836

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Contact Us
Abstract[English] Transmissions in a data center communications network are monitored at a sending computer, the transmission of data packets being controlled by control messages sent by a receiving computer. The monitor at the sending computer measures the time that a burst of data takes to be transmitted from the sending computer to the receiving computer. Based on feedback received from the receiving computer, the monitor at the sending computer calculates one of more estimated completion times for the transmission. The estimated completion times will approximately match the measured completion time if the network is not the bottleneck for communication. When there is a mismatch between the estimated and measured completion times, this is logged and the information is used to trigger analysis to detect the reason and possible causes for the network under-performing.[French] Des transmissions dans un réseau de communication de centre de données sont surveillées au niveau d'un ordinateur d'envoi, la transmission de paquets de données étant commandée par des messages de commande envoyés par un ordinateur de réception. Le moniteur au niveau de l'ordinateur d'envoi mesure le temps mis par une rafale de données pour être transmise de l'ordinateur d'envoi à l'ordinateur de réception. Sur la base d'une rétroaction reçue en provenance de l'ordinateur de réception, le moniteur au niveau de l'ordinateur d'envoi calcule un ou plusieurs temps d'achèvement estimés pour permettre la transmission. Les temps d'achèvement estimés correspondront approximativement au temps d'achèvement mesuré si le réseau n'est pas le goulot d'étranglement pour une communication. Lorsqu'il y a une non-concordance entre les temps d'achèvement estimés et mesurés, cela est journalisé et les informations sont utilisées pour déclencher une analyse afin de détecter la raison et des causes possibles d'une sous-performance du réseau.

Rejoining the server...