WO2023017485 - METHOD AND APPARATUS TO ESTABLISH A GEOTHERMAL WELL FOR CLOSED LOOP FLUID CIRCULATION AND GEOTHERMAL HEAT EXTRACTION

National phase entry:
Publication Number WO/2023/017485
Publication Date 16.02.2023
International Application No. PCT/IB2022/057563
International Filing Date 12.08.2022
Title **
[English] METHOD AND APPARATUS TO ESTABLISH A GEOTHERMAL WELL FOR CLOSED LOOP FLUID CIRCULATION AND GEOTHERMAL HEAT EXTRACTION
[French] PROCÉDÉ ET APPAREIL POUR ÉTABLIR UN PUITS GÉOTHERMIQUE POUR UNE CIRCULATION DE FLUIDE EN BOUCLE FERMÉE ET UNE EXTRACTION DE CHALEUR GÉOTHERMIQUE
Applicants **
REELWELL AS Vingvegen 1 4050 Sola, NO
Inventors
VESTAVIK, Ola Nedre Sorlia 2 6092 Fosnavåg, NO
Priority Data
63/232,693   13.08.2021   US
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
*
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1075
EPO Filing, Examination4562
Japan Filing588
South Korea Filing574
USA Filing, Examination2710
MasterCard Visa

Total: 9509

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] A method to establish a well (10) using a nested drill/completion string. The nested drill/completion string (D) includes an inner pipe (14) nested in an outer pipe (13), a flow crossover (16) disposed at an end of the nested drill string (D) and a drill bit (18) disposed to one side of the flow crossover (16). Drilling fluid (22) is pumped into the well through a first annular space (12) between the inner pipe (14) and the outer pipe (13), and drill cuttings created by the drill bit (18) are returned to surface through in inner pipe (14). For the completion of the well (10), either (i) fluid in the annular space (12) is displaced with a lower conductivity fluid or (ii) the annular space is evacuated. Fluid to be heated (26) is pumped through a second annular space (11) between the well (10) and the exterior of the nested drill string (D) and geothermally heated fluid is moved from the subsurface to the surface through the inner pipe (14).[French] Procédé pour établir un puits (10) à l'aide d'un train de tiges/complétion emboîté. Le train de tiges/complétion emboîté (D) comprend un tuyau interne (14) emboîté dans un tuyau externe (13), un passage d'écoulement (16) disposé à une extrémité du train de tiges emboîté (D) et un trépan (18) disposé sur un côté du croisement d'écoulement (16). Un fluide de forage (22) est pompé dans le puits à travers un premier espace annulaire (12) entre le tuyau interne (14) et le tuyau externe (13), et des déblais de forage créés par le trépan (18) sont renvoyés à la surface à travers le tuyau interne (14). Pour l'achèvement du puits (10), soit (i) le fluide dans l'espace annulaire (12) est déplacé à l'aide d'un fluide à conductivité inférieure ou (ii) l'espace annulaire est évacué. Le fluide à chauffer (26) est pompé à travers un second espace annulaire (11) entre le puits (10) et l'extérieur du train de tiges emboîté (D) et le fluide géothermique chauffé est déplacé de la subsurface à la surface à travers le tuyau interne (14).
An unhandled error has occurred. Reload 🗙