WO2023007419 - QUICK INSTALLATION PIPE COUPLING WITH SUPPORTING BARRIER RING.
National phase entry:
Publication Number
WO/2023/007419
Publication Date
02.02.2023
International Application No.
PCT/IB2022/056987
International Filing Date
28.07.2022
Title **
[English]
QUICK INSTALLATION PIPE COUPLING WITH SUPPORTING BARRIER RING.
[French]
RACCORD DE TUYAU À INSTALLATION RAPIDE AVEC ANNEAU FORMANT BARRIÈRE DE SUPPORT
Applicants **
AALBERTS INTEGRATED PIPING SYSTEMS APAC INC.
No. 295, Section 3 Wandan Road
WANDAN, PINGTUN, TW
Inventors
CHANG, Bob
c/o Aalberts integrated piping systems APAC Inc.
No. 295, Section 3 Wandan Road
WANDAN, PINGTUN, -, TW
Priority Data
2028870
28.07.2021
NL
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 1127 | |
| EPO | Filing, Examination | 4733 | |
| Japan | Filing | 595 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 2710 |

Total: 9740 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A quick installation pipe coupling comprises a supporting barrier ring (B) that is located between a gasket (C) and a bottom wall of an annular channel (10) that is defined by housing segments (A) in between arcuate engaging shoulders (11) thereof. The supporting barrier ring (B) extends as a protective barrier circumferentially around an outer surface of the gasket (C), and is dimensioned and configured to support the housing segments (A) spaced-apart in a pre-assembled ready for installation state of the coupling with their arcuate engaging shoulders (11) delimiting insertion openings (25) towards the central space that are larger than cross-sectional dimensions of the pipe ends before tightening of connection members (D, E).[French]
Un raccord de tuyau à installation rapide comprend un anneau formant barrière de support (B) qui est situé entre un joint d'étanchéité (C) et une paroi inférieure d'un canal annulaire (10) qui est définie par des segments de logement (A) entre des épaulements de mise en prise arqués (11) de celle-ci. L'anneau formant barrière de support (B) s'étend sous la forme d'une barrière de protection de manière circonférentielle autour d'une surface extérieure du joint d'étanchéité (C), et est dimensionné et conçu pour porter les segments de logement (A) espacés dans une position pré-assemblée prête à l'installation du raccord avec leurs épaulements de mise en prise arqués (11) délimitant des ouvertures d'insertion (25) vers l'espace central qui sont plus grandes que les dimensions en coupe transversale des extrémités de tuyau avant le serrage d'éléments de raccordement (D, E).