WO2026131466 - VERFAHREN ZUM BETRIEB EINER PV-ANLAGE UND PV-ANLAGE

National phase entry is expected:
Publication Number WO/2026/131466
Publication Date 25.06.2026
International Application No. PCT/EP2025/086678
International Filing Date 11.12.2025
Title **
[German] VERFAHREN ZUM BETRIEB EINER PV-ANLAGE UND PV-ANLAGE
[English] METHOD FOR OPERATING A PV SYSTEM, AND PV SYSTEM
[French] PROCÉDÉ DE FONCTIONNEMENT D'UN SYSTÈME PV ET SYSTÈME PV
Applicants **
SMA SOLAR TECHNOLOGY AG
Inventors
KHALFET, Chokri
KHSHAINY, Mohamed
Priority Data
102024139549.4   21.12.2024   DE
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2068
EPO Filing, Examination, Granting9270
Japan Filing, Examination, Granting2250
South Korea Filing, Examination, Granting2266
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 20,594
Contact Us
Abstract[German] Die Anmeldung betrifft ein Verfahren zum Betrieb einer PV-Anlage (100) an einem Arbeitspunkt (AP) mit einer DC-Spannung (U_DC) und einer DC-Leistung. Die PV-Anlage (100) weist einen PV-Generator (11) und eine Wechselrichteranlage (20) auf. Die Wechselrichteranlage (20) ist zum Umwandeln der DC-Leistung (P_PV) des PV-Generators (11) in eine dreiphasige elektrische AC-Gesamtleistung (P_AC) eingerichtet und weist einen primären Wechselrichter (10) und zumindest einen sekundären Wechselrichter (WR2, WR3,..., WRn) auf. Die Wechselrichter (10, WR2, WR3,..., WRn) sind DC-seitig und AC-seitig parallelgeschaltet. Das Verfahren weist einen Betrieb des zumindest einen sekundären Wechselrichters (WR2, WR3,..., WRn) mittels einer in den Wechselrichtern (10, WR2, WR3,..., WRn) hinterlegten Droop-Steuerkurve (12.2, 12.3,..., 12.n) auf, indem ein Sollwert (P2_s, P3_s,..., Pn_s) für eine Einzel-Leistung (P2, P3,..., Pn) des zumindest einen sekundären Wechselrichters (WR2, WR3,..., WRn) in Abhängigkeit von der DC-Spannung (U_DC) am Arbeitspunkt (AP) gemäß der Droop-Steuerkurve (12.2,..., 12.n) vorgegeben wird. Weiterhin weist das Verfahren einen Betrieb des primären Wechselrichters (10) mittels einer MPPT-Regelung (MPPT) auf, indem ein Sollwert (U_DC_s) für die DC-Spannung (U_DC) am Arbeitspunkt (AP) vorgegeben und durch Variation der Einzel-Leistung (P1) des primären Wechselrichters (10) eingestellt wird. Der primäre Wechselrichter (10) verschiebt den Arbeitspunkt (AP) entlang der DC-Spannung (U_DC) schrittweise, um eine aus der Einzel-Leistung (P1) des primären Wechselrichters (10) und der Anwendung der hinterlegten Droop-Steuerkurve (12.2,..., 12.n) in dem zumindest einen sekundären Wechselrichter (WR2, WR3,..., WRn) resultierende Gesamtleistung des PV-Generators (11) zu maximieren. Die Anmeldung betrifft weiter eine PV-Anlage (100).[English] The application relates to a method for operating a PV system (100) at an operating point (AP) having a DC voltage (U_DC) and a DC output. The PV system (100) has a PV generator (11) and an inverter system (20). The inverter system (20) is designed to convert the DC output (P_PV) of the PV generator (11) into a three-phase electric AC total output (P_AC) and has a primary inverter (10) and at least one secondary inverter (WR2, WR3,..., WRn). The inverters (10, WR2, WR3,..., WRn) are connected in parallel on the DC side and on the AC side. The method comprises operation of the at least one secondary inverter (WR2, WR3,..., WRn) by means of a droop control curve (12.2, 12.3,..., 12.N) stored in the inverters (10, WR2, WR3,..., WRn), by specifying a setpoint value (P2_s, P3_s ,..., Pn_s) for an individual output (P2, P3,..., Pn) of the at least one secondary inverter (WR2, WR3,..., WRn) as a function of the DC voltage (U_DC) at the operating point (AP) according to the droop control curve (12.2,..., 12.N). Furthermore, the method comprises operation of the primary inverter (10) by means of MPPT control (MPPT), by specifying a setpoint value (U_DC_s) for the DC voltage (U_DC) at the operating point (AP) and setting the setpoint value by varying the individual output (P1) of the primary inverter (10). The primary inverter (10) incrementally shifts the operating point (AP) along the DC voltage (U_DC), in order to maximize the total output of the PV generator (11) resulting from the individual output (P1) of the primary inverter (10) and the use of the stored droop control curve (12.2,..., 12.n) in the at least one secondary inverter (WR2, WR3,..., WRn). The application further relates to a PV system (100).[French] La demande se rapporte à un procédé de fonctionnement d'un système PV (100) au niveau d'un point de fonctionnement (AP) ayant une tension continue (U_DC) et une sortie de CC. Le système PV (100) comprend un générateur PV (11) et un système onduleur (20). Le système onduleur (20) est conçu pour convertir la sortie de CC (P_PV) du générateur PV (11) en une sortie totale de CA électrique triphasée (P_AC) et comprend un onduleur primaire (10) et au moins un onduleur secondaire (WR2, WR3,..., WRn). Les onduleurs (10, WR2, WR3,..., WRn) sont connectés en parallèle côté CC et côté CA. Le procédé comprend le fonctionnement du ou des onduleurs secondaires (WR2, WR3,..., WRn) au moyen d'une courbe de commande de statisme (12.2, 12,3,..., 12.N) stockée dans les onduleurs (10, WR2, WR3,..., WRn), en spécifiant une valeur de consigne (P2_s, P3_s,..., Pn_s) pour une sortie individuelle (P2, P3,..., Pn) du ou des onduleurs secondaires (WR2, WR3,..., WRn) en fonction de la tension continue (U_DC) au point de fonctionnement (AP) en fonction de la courbe de commande de statisme (12.2,..., 12.N). En outre, le procédé comprend le fonctionnement de l'onduleur primaire (10) au moyen d'une commande de MPPT (MPPT), en spécifiant une valeur de consigne (U_DC_s) pour la tension continue (U_DC) au point de fonctionnement (AP) et en réglant la valeur de consigne en faisant varier la sortie individuelle (P1) de l'onduleur primaire (10). L'onduleur primaire (10) décale de manière incrémentielle le point de fonctionnement (AP) le long de la tension continue (U_DC), afin de maximiser la sortie totale du générateur PV (11) résultant de la sortie individuelle (P1) de l'onduleur primaire (10) et l'utilisation de la courbe de commande de statisme stockée (12.2,..., 12.N) dans le ou les onduleurs secondaires (WR2, WR3,..., WRn). La demande se rapporte en outre à un système PV (100).