WO2026068184 - VERFAHREN ZUM BETREIBEN EINER WASSERSTOFFPRODUKTIONSANLAGE UND WASSERSTOFFPRODUKTIONSANLAGE
National phase entry is expected:
Publication Number
WO/2026/068184
Publication Date
02.04.2026
International Application No.
PCT/EP2025/075597
International Filing Date
09.09.2025
Title **
[German]
VERFAHREN ZUM BETREIBEN EINER WASSERSTOFFPRODUKTIONSANLAGE UND WASSERSTOFFPRODUKTIONSANLAGE
[English]
METHOD FOR OPERATING A HYDROGEN PRODUCTION PLANT, AND HYDROGEN PRODUCTION PLANT
[French]
PROCÉDÉ POUR FAIRE FONCTIONNER UNE INSTALLATION DE PRODUCTION D'HYDROGÈNE ET INSTALLATION DE PRODUCTION D'HYDROGÈNE
Applicants **
QUEST ONE GMBH
Inventors
GEIGER, Simon
PRESCHER, Ralf
BRANDT, Yannik
HARTUNG, Ingmar
Priority Data
102024128012.3
27.09.2024
DE
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2173 | |
| EPO | Filing, Examination, Granting | 10236 | |
| Japan | Filing, Examination, Granting | 2277 | |
| South Korea | Filing, Examination, Granting | 2318 | |
| USA | Filing, Examination, Granting | 5340 |

Total:
22,344
Contact Us
Abstract[German]
Verfahren zum Betreiben einer Wasserstoffproduktionsanlage (10) mit mehreren Elektrolysevorrichtungen (11), die zur Erzeugung von Wasserstoff aus Wasser mit Hilfe von elektrischem Strom eingerichtet sind, wobei die Elektrolysevorrichtungen (11) vorzugsweise mehrere parallel geschaltete Kaskaden (12) aus jeweils in Reihe geschalteten Elektrolysevorrichtungen (11) bilden, wobei zur Wasserstoffproduktion die Elektrolysevorrichtungen (11) über einen Wasserkreislauf (13) mit Wasser versorgt werden, wobei zur Wasserstoffproduktion die Elektrolysevorrichtungen (11) von einer elektrischen Stromquelle oder elektrischen Spannungsquelle mit elektrischer Leistung versorgt werden. Zur Überprüfung, ob an einer Elektrolysevorrichtung (11) eine Wasserstoffleckage vorliegt, werden folgende Schritte einer Sicherheitsroutine ausgeführt werden: Die zu überprüfende Elektrolysevorrichtung (11) wird mit einer definierten elektrischen Eingangsgröße beaufschlagt. An der zu überprüfenden Elektrolysevorrichtung (11) wird eine von der definierten elektrischen Eingangsgröße abhängige, elektrische Ist-Ausgangsgröße erfasst. Die an der zu überprüfenden Elektrolysevorrichtung (11) erfasste Ist-Ausgangsgröße wird mit einer Soll-Ausgangsgröße verglichen. Abhängig von dem Vergleich der Ist-Ausgangsgröße mit der Soll-Ausgangsgröße wird auf eine Wasserstoffleckage oder die Wahrscheinlichkeit einer Wasserstoffleckage an der Elektrolysevorrichtung (11) geschlossen.[English]
The invention relates to a method for operating a hydrogen production plant (10) having a plurality of electrolysis devices (11), which are designed to generate hydrogen from water with the aid of an electric current, wherein the electrolysis devices (11) preferably form a plurality of cascades (12) connected in parallel, each cascade consisting of electrolysis devices (11) connected in series, the electrolysis devices (11) are supplied with water via a water circuit (13) in order to produce hydrogen, and the electrolysis devices (11) are supplied with electric power from an electric power source or an electric voltage source in order to produce hydrogen. In order to check whether there is a hydrogen leak in an electrolysis device (11), the following steps of a safety routine are carried out: a defined electrical input variable is supplied to the electrolysis device (11) to be checked; an actual electrical output variable which is based on the defined electrical input variable is detected at the electrolysis device (11) to be checked; the actual output variable detected at the electrolysis device (11) to be checked is compared with a target output variable; and a hydrogen leak or the probability of a hydrogen leak at the electrolysis device (11) is inferred on the basis of the comparison of the actual output variable with the target output variable.[French]
L'invention concerne un procédé pour faire fonctionner une installation de production d'hydrogène (10) comprenant plusieurs dispositifs d'électrolyse (11) qui sont conçus pour produire de l'hydrogène à partir d'eau à l'aide d'un courant électrique, les dispositifs d'électrolyse (11) formant de préférence plusieurs cascades (12) montées en parallèle, respectivement constituées de dispositifs d'électrolyse (11) montés en série ; pour la production d'hydrogène, les dispositifs d'électrolyse (11) étant alimentés en eau par l'intermédiaire d'un circuit d'eau (13), les dispositifs d'électrolyse (11) étant alimentés en énergie électrique par une source de courant électrique ou une source de tension électrique. Afin de vérifier la présence d'une fuite d'hydrogène au niveau d'un dispositif d'électrolyse (11), les étapes suivantes d'une routine de sécurité étant exécutées : Le dispositif d'électrolyse (11) à vérifier est soumis à une grandeur d'entrée électrique définie. Une grandeur de sortie réelle électrique, dépendante de la grandeur d'entrée électrique définie, est détectée au niveau du dispositif d'électrolyse (11) à vérifier. La grandeur de sortie réelle détectée au niveau du dispositif d'électrolyse (11) à vérifier est comparée à une grandeur de sortie de consigne. En fonction de la comparaison de la grandeur de sortie réelle avec la grandeur de sortie de consigne, on en déduit une fuite d'hydrogène ou la probabilité d'une fuite d'hydrogène au niveau du dispositif d'électrolyse (11).