WO2026022029 - FAULT RIDE THROUGH CAPABILITY OF ELECTROLYSIS PLANTS

National phase entry is expected:
Publication Number WO/2026/022029
Publication Date 29.01.2026
International Application No. PCT/EP2025/070664
International Filing Date 18.07.2025
Title **
[English] FAULT RIDE THROUGH CAPABILITY OF ELECTROLYSIS PLANTS
[French] CAPACITÉ DE FONCTIONNEMENT DES INSTALLATIONS D'ÉLECTROLYSE EN CAS DE DÉFAUT
Applicants **
SIEMENS ENERGY GLOBAL GMBH & CO. KG
Inventors
SCHUMANN, Sven
NIEDERNHUBER, Josef Alois
BENDIG, Marvin
LOKU, Fisnik
LANGENBERG, Nils
Priority Data
24189985.5   22.07.2024   EP
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2140
EPO Filing, Examination, Granting10170
Japan Filing, Examination, Granting2279
South Korea Filing, Examination, Granting2323
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 21,652
Contact Us
Abstract[English] The present invention pertains to a method for operating an electrolysis plant as well a corresponding electrolysis plant, in particular to provide compliance with fault-ride- through requirements of a grid. Accordingly, a method for operating an electrolysis plant (10) is suggested, comprising the steps of receiving (100) successive voltage measurements from an AC voltage input (12) designed for a connection to a grid (14) and for receiving power from the grid to supply at least one electrolyzer (18) of an electrolysis system of the electrolysis plant (10) with electrolysis current; detecting (110) at least one anomaly in the voltage level based on the voltage measurements; and switching (120) an on-load tap changer (22) connected to the AC voltage input (12) or to at least one transformer upstream of the electrolysis system in response to a detected anomaly to adjust the voltage input to the electrolysis system.[French] La présente invention concerne un procédé d'exploitation d'une installation d'électrolyse ainsi qu'une installation d'électrolyse correspondante, en particulier pour assurer la conformité aux exigences de fonctionnement en cas de défaut d'une grille. En conséquence, un procédé de fonctionnement d'une installation d'électrolyse (10) est suggéré, comprenant les étapes consistant à recevoir (100) des mesures de tension successives à partir d'une entrée de tension alternative (12) conçue pour une connexion à une grille (14) et pour recevoir de l'énergie provenant de la grille pour alimenter au moins un électrolyseur (18) d'un système d'électrolyse de l'installation d'électrolyse (10) avec un courant d'électrolyse ; détecter (110) au moins une anomalie dans le niveau de tension sur la base des mesures de tension ; et commuter (120) un changeur de prises en charge (22) connecté à l'entrée de tension alternative (12) ou à au moins un transformateur en amont du système d'électrolyse en réponse à une anomalie détectée pour ajuster l'entrée de tension du système d'électrolyse.