WO2025131623 - COMPUTER-IMPLEMENTED METHOD FOR VERIFYING A GRID CODE COMPLIANCE OF LARGE-SCALE ELECTROLYSIS PLANTS

National phase entry is expected:
Publication Number WO/2025/131623
Publication Date 26.06.2025
International Application No. PCT/EP2024/084084
International Filing Date 29.11.2024
Title **
[English] COMPUTER-IMPLEMENTED METHOD FOR VERIFYING A GRID CODE COMPLIANCE OF LARGE-SCALE ELECTROLYSIS PLANTS
[French] PROCÉDÉ MIS EN ŒUVRE PAR ORDINATEUR POUR VÉRIFIER LA CONFORMITÉ D'UN CODE DE GRILLE D'INSTALLATIONS D'ÉLECTROLYSE À GRANDE ÉCHELLE
Applicants **
SIEMENS ENERGY GLOBAL GMBH & CO. KG
Inventors
LOKU, Fisnik
LUKIANOV, Semen
SCHUMANN, Sven
Priority Data
23220007.1   22.12.2023   EP
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1938
EPO Filing, Examination, Granting8113
Japan Filing, Examination, Granting2061
South Korea Filing, Examination, Granting1883
USA Filing, Examination, Granting5340
MasterCard Visa
Total: 19,335

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Contact Us
Abstract[English] A computer-implemented method (100) for verifying a grid code compliance of an electrolysis plant is provided, wherein the electrolysis plant comprises a plurality of essentially identical electrolysis systems connected in parallel to a same AC power grid. The method comprises determining (104) a model of the AC power grid and at least one grid code requirement, determining (106) a model of the electrolysis plant, and verifying (108) a grid code compliance of the electrolysis plant by performing a simulated grid compliance test with respect to the at least one grid code requirement, for the model of the electrolysis plant connected to the model of the AC power grid, wherein the step of determining (106) a model of the electrolysis plant comprises determining (110) a first set of parameter values characterizing a first electrolysis system of the plurality of essentially identical electrolysis systems and a scaling factor corresponding to a size of the plurality of essentially identical electrolysis systems, and determining (112) an aggregated set of parameter values characterizing the electrolysis plant as the first set of parameter values scaled depending on said scaling factor. The step of verifying (108) a grid code compliance of the electrolysis plant further comprises operating the electrolysis plant connected to the AC power grid using the first set of parameter values for which the performed simulated grid compliance test indicates a positive result, and the at least one grid code requirement comprises a power quality or a fault-ride-through capability.[French] L'invention concerne un procédé mis en œuvre par ordinateur (100) pour vérifier la conformité d'un code de grille d'une installation d'électrolyse, l'installation d'électrolyse comprenant une pluralité de systèmes d'électrolyse sensiblement identiques connectés parallèlement à un même réseau électrique CA. Le procédé comprend la détermination (104) d'un modèle du réseau électrique CA et d'au moins une exigence de code de grille, la détermination (106) d'un modèle de l'installation d'électrolyse, et la vérification (108) de la conformité d'un code de grille de l'installation d'électrolyse par réalisation d'un test de conformité de grille simulée par rapport à l'au moins une exigence de code de grille, pour le modèle de l'installation d'électrolyse connecté au modèle du réseau électrique CA, l'étape de détermination (106) d'un modèle de l'installation d'électrolyse comprenant la détermination (110) d'un premier ensemble de valeurs de paramètre caractérisant un premier système d'électrolyse de la pluralité de systèmes d'électrolyse sensiblement identiques et un facteur de mise à l'échelle correspondant à une taille de la pluralité de systèmes d'électrolyse sensiblement identiques, et la détermination (112) d'un ensemble agrégé de valeurs de paramètre caractérisant l'installation d'électrolyse en tant que premier ensemble de valeurs de paramètre mises à l'échelle en fonction dudit facteur de mise à l'échelle. L'étape de vérification (108) de la conformité d'un code de grille de l'installation d'électrolyse comprend en outre le fonctionnement de l'installation d'électrolyse connectée au réseau électrique CA à l'aide du premier ensemble de valeurs de paramètre pour lequel le test de conformité de grille simulée effectué indique un résultat positif, et l'au moins une exigence de code de grille comprend une qualité de puissance ou une capacité d'alimentation sans panne.

Rejoining the server...