WO2026041210 - ARRANGEMENT OF A DRY CONSTRUCTION WALL ON A BUILDING ELEMENT, COMPRISING A MOVABLE CONNECTION AND ALLOWING TO OBTAIN ENHANCED FIRE-RETARDANT OR FIRE-RESISTANT PROPERTIES
National phase entry is expected:
Publication Number
WO/2026/041210
Publication Date
26.02.2026
International Application No.
PCT/EP2024/025247
International Filing Date
19.08.2024
Title **
[English]
ARRANGEMENT OF A DRY CONSTRUCTION WALL ON A BUILDING ELEMENT, COMPRISING A MOVABLE CONNECTION AND ALLOWING TO OBTAIN ENHANCED FIRE-RETARDANT OR FIRE-RESISTANT PROPERTIES
[French]
AGENCEMENT D'UNE PAROI DE CONSTRUCTION SÈCHE SUR UN ÉLÉMENT DE CONSTRUCTION, COMPRENANT UNE LIAISON MOBILE ET PERMETTANT D'OBTENIR DES PROPRIÉTÉS IGNIFUGES OU RÉSISTANTES AU FEU AMÉLIORÉES
Applicants **
KNAUF GIPS KG
Inventors
MEDER, Sebastian
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1980 | |
| EPO | Filing, Examination, Granting | 8624 | |
| Japan | Filing, Examination, Granting | 2183 | |
| South Korea | Filing, Examination, Granting | 2040 | |
| USA | Filing, Examination, Granting | 6540 |

Total:
21,367
Contact Us
Abstract[English]
The invention relates to an arrangement of dry construction wall (1, 1') on a building element (2), wherein the dry construction wall (1, 1') comprises a first stud (4, 4') and a second stud (5, 5'), wherein the first and the second stud (4, 4', 5, 5') are arranged at a stud spacing (S) from one another, wherein the first and the second stud (4, 4', 5, 5') have a first side (40) and a second side (41), wherein a first planking (6) is arranged on the first side (40) and a second planking (7) is arranged on the second side (41), wherein a movable connection (8) is formed between the dry construction wall (1, 1') and the building element (2). The invention is characterized in that the dry construction wall (1, 1') has a first barrier body (9) between the first and the second planking (6, 7), the barrier body being arranged between the first and the second stud (4, 4', 5, 5'). This especially allows to enhance the fire-resistance of the dry construction wall.[French]
L'invention concerne un agencement de paroi de construction sèche (1, 1') sur un élément de construction (2) ; ladite paroi de construction sèche (1, 1') comprend un premier goujon (4, 4') et un second goujon (5, 5') ; le premier et le second goujon (4, 4', 5, 5') sont agencés au niveau d'un espacement de goujon (S) l'un de l'autre ; le premier et le second goujon (4, 4', 5, 5') présentent un premier côté (40) et un second côté (41) ; une première fixation (6) est disposée sur le premier côté (40) et une seconde fixation (7) est disposée sur le second côté (41) ; une liaison mobile (8) est formée entre la paroi de construction sèche (1, 1') et l'élément de construction (2). L'invention est caractérisée en ce que la paroi de construction sèche (1, 1') présente un premier corps de barrière (9) entre la première et la seconde fixation (6, 7), le corps de barrière étant disposé entre le premier et le second goujon (4, 4', 5, 5'). Ceci permet en particulier d'améliorer la résistance au feu de la paroi de construction sèche.