WO2026012559 - PARTIAL LOAD OPERATION USING WIND SENSING
National phase entry is expected:
Publication Number
WO/2026/012559
Publication Date
15.01.2026
International Application No.
PCT/DK2025/050120
International Filing Date
07.07.2025
Title **
[English]
PARTIAL LOAD OPERATION USING WIND SENSING
[French]
OPÉRATION DE CHARGE PARTIELLE À L'AIDE D'UNE DÉTECTION DE VENT
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
NETO, Julio Xavier Vianna
SVENSTRUP, Mikael Aslak
FERREIRA BRANCO, Alice
Priority Data
PA202430401
09.07.2024
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2047 | |
| EPO | Filing, Examination, Granting | 8156 | |
| Japan | Filing, Examination, Granting | 2155 | |
| South Korea | Filing, Examination, Granting | 2071 | |
| USA | Filing, Examination, Granting | 5340 |

Total:
19,769
Contact Us
Abstract[English]
The present disclosure describes a wind turbine that considers upstream wind speed and delays in the wind turbine dynamics when operating in partial load. The wind turbine includes an electrical generator, a rotor, a wind sensor, and a controller. The controller measures, at a first time and using the wind sensor, a first speed of wind upstream of the rotor. The wind will reach the rotor at a second time after the first time. The controller determines a final speed of the rotor and a reference and dispatches, at a third time between the first time and the second time, the reference to the electrical generator to adjust a speed of the rotor towards the final speed. An amount of time between the third time and the second time is sufficient for the speed of the rotor to transition to the final speed by the second time.[French]
La présente divulgation concerne une éolienne qui considère la vitesse du vent en amont et les retards dans la dynamique de l'éolienne lors du fonctionnement en charge partielle. L'éolienne comprend un générateur électrique, un rotor, un capteur de vent et un dispositif de commande. Le dispositif de commande mesure, à un premier instant et à l'aide du capteur de vent, une première vitesse du vent en amont du rotor. Le vent atteindra le rotor à un deuxième instant après le premier instant. Le dispositif de commande détermine une vitesse finale du rotor et une référence et envoie, à un troisième instant entre le premier instant et le deuxième instant, la référence au générateur électrique pour ajuster une vitesse du rotor vers la vitesse finale. Une durée entre le troisième instant et le deuxième instant est suffisante pour que la vitesse du rotor passe à la vitesse finale par le deuxième instant.