WO2026002347 - A METHOD AND A CONTROL ARRANGEMENT FOR CONTROLLING A RENEWABLE POWER PLANT

National phase entry is expected:
Publication Number WO/2026/002347
Publication Date 02.01.2026
International Application No. PCT/DK2025/050093
International Filing Date 11.06.2025
Title **
[English] A METHOD AND A CONTROL ARRANGEMENT FOR CONTROLLING A RENEWABLE POWER PLANT
[French] PROCÉDÉ ET AGENCEMENT DE COMMANDE POUR COMMANDER UNE CENTRALE ÉLECTRIQUE RENOUVELABLE
Applicants **
VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N, DK
Inventors
BONDY, Daniel Esteban Damgaard Morales c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
JENSEN, Tue Vissing c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
NAYEBI, Kouroush c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
MØLLER, Henrik c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
HØGDAHL, Martin c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
ERIKSEN, Emil Haldrup c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
JENSEN, Jesper Halkjær c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
Priority Data
PA202430353   27.06.2024   DK
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1263
EPO Filing, Examination5203
Japan Filing594
South Korea Filing574
USA Filing, Examination3310
MasterCard Visa

Total: 10,944

Abstract[English] A method and a control arrangement for controlling a renewable power plant (100) connected to a power grid (116) are presented. The method comprises, for each time frame of a sequence of time frames: - determining (210) one or more proactive policies (314pol) and corresponding priority indications (314pri) of a proactive control loop (310) associated with the renewable power plant (100); - determining (220) one or more run-time policies (322pol) and corresponding priority indications (322pri) of a run-time control loop (320) associated with the renewable power plant (100); - determining (230), by utilization of their priority indications (314pri, 322pri), a hierarchic order of the one or more proactive policies (314pol) and the one or more run-time policies (322pol); - determining (240) a control configuration (331) for the renewable power plant (100) based on the determined hierarchic order, the one or more proactive policies (314pol), and the one or more run-time policies (322pol); and - controlling (250) the renewable power plant (100) based on the determined control configuration (331).[French] L'invention concerne un procédé et un agencement de commande pour commander une centrale électrique renouvelable (100) connectée à un réseau électrique (116). Le procédé comprend, pour chaque trame temporelle d'une séquence de trames temporelles : - déterminer (210) une ou plusieurs politiques proactives (314pol) et des indications de priorité correspondantes (314 pri) d'une boucle de commande proactive (310) associée à la centrale électrique renouvelable (100) ; - déterminer (220) une ou plusieurs politiques de temps d'exécution (322 pol) et des indications de priorité correspondantes (322 pri) d'une boucle de commande de temps d'exécution (320) associée à la centrale électrique renouvelable (100) ; - déterminer (230), par utilisation de leurs indications de priorité (314 pri, 322 pri), un ordre hiérarchique de la ou des politiques proactives (314 pol) et de la ou des politiques de temps d'exécution (322 pol) ; - déterminer (240) une configuration de commande (331) pour la centrale électrique renouvelable (100) sur la base de l'ordre hiérarchique déterminé, de la ou des politiques proactives (314 pol), et de la ou des politiques de temps d'exécution (322 pol) ; et - commander (250) la centrale électrique renouvelable (100) sur la base de la configuration de commande déterminée (331).