WO2025168185 - POWER PLANT ARRANGEMENT

National phase entry is expected:
Publication Number WO/2025/168185
Publication Date 14.08.2025
International Application No. PCT/DK2025/050010
International Filing Date 21.01.2025
Title **
[English] POWER PLANT ARRANGEMENT
[French] AGENCEMENT DE CENTRALE ÉLECTRIQUE
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
MAMMEN, Mathias Hans Ripka
RATHA, Anubhav
Priority Data
PA202430064   08.02.2024   DK
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2053
EPO Filing, Examination, Granting8637
Japan Filing, Examination, Granting2186
South Korea Filing, Examination, Granting2135
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 19,751
Contact Us
Abstract[English] A method of operating a power plant arrangement (12), the power plant arrangement (12) comprising at least one electrical generator (14) and first and second electrolysis stacks (42a, 42b). The method comprises: operating the first electrolysis stack (42a) to consume electrical power at a first power level corresponding to a first efficiency level for the first electrolysis stack (42a); and operating the second electrolysis stack (42b) to consume electrical power at a second power level corresponding to a second efficiency level for the second electrolysis stack (42b), the second efficiency level being lower than the first efficiency level. At least a portion of the electrical power consumed by each of the first and second electrolysis stacks (42a, 42b) is produced by the at least one electrical generator (14).[French] L'invention concerne un procédé d’exploitation d'un agencement (12) de centrale électrique, l'agencement (12) de centrale électrique comprenant au moins un générateur électrique (14) et des premier et second blocs (42a, 42b) d’électrolyse. Le procédé comporte : l’exploitation du premier bloc (42a) d’électrolyse de façon à consommer de l'énergie électrique à un premier niveau de puissance correspondant à un premier niveau de rendement pour le premier bloc (42a) d’électrolyse ; et l’exploitation du second bloc (42b) d’électrolyse de façon à consommer de l'énergie électrique à un second niveau de puissance correspondant à un second niveau de rendement pour le second bloc (42b) d’électrolyse, le second niveau de rendement étant inférieur au premier niveau de rendement. Au moins une partie de l'énergie électrique consommée par chacun des premier et second blocs (42a, 42b) d’électrolyse est produite par le ou les générateurs électriques (14).