WO2025008037 - INSPECTION OF BOLTED CONNECTIONS IN A WIND TURBINE

National phase entry:
Publication Number WO/2025/008037
Publication Date 09.01.2025
International Application No. PCT/DK2024/050158
International Filing Date 02.07.2024
Title **
[English] INSPECTION OF BOLTED CONNECTIONS IN A WIND TURBINE
[French] INSPECTION DE RACCORDEMENTS BOULONNÉS DANS UNE ÉOLIENNE
Applicants **
VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N, DK
Inventors
ÖSTERBERG, David c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
LIMA CARNEIRO CAVALEIRO, Pedro Manuel c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
Priority Data
PA202370357   04.07.2023   DK
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1188
EPO Filing, Examination5578
Japan Filing592
South Korea Filing574
USA Filing, Examination2710
MasterCard Visa

Total: 10642

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] A method and system for scheduling inspection of a bolted connection on a wind turbine, the bolted connection comprising a bolt under tension. At a first sample time, a first tension parameter of the bolt is determined, having an associated upper uncertainty bound, and, at a second sample time, a second tension parameter of the bolt is determined, having an associated lower uncertainty bound. Thereafter, a linear relationship is determined based on the upper uncertainty bound of the first tension parameter and the lower uncertainty bound of the second tension parameter. Based on that linear relationship, a third sample time is determined in the future, at which a further tension parameter is determined. Based on the third sample time, an inspection event is scheduled. A benefit of the invention is that inspection events are scheduled in an adaptive manner in a way that is responsive to the difference in values of those measurements, but which takes account of the inherent uncertainty in such measurements without compromising safety. In this way, inspection events can be scheduled less frequently that is currently the case which presents a much- reduced maintenance cost which still ensuring the integrity of the bolted connection.[French] L'invention concerne un procédé et un système de planification de l'inspection d'un raccordement boulonné sur une éolienne, ledit raccordement boulonné comprenant un boulon sous tension. À un premier moment d'échantillonnage, un premier paramètre de tension du boulon est déterminé, ayant une limite d'incertitude supérieure associée, et, à un deuxième moment d'échantillonnage, un deuxième paramètre de tension du boulon est déterminé, ayant une limite d'incertitude inférieure associée. Ensuite, une relation linéaire est déterminée sur la base de la limite d'incertitude supérieure du premier paramètre de tension et de la limite d'incertitude inférieure du deuxième paramètre de tension. Sur la base de cette relation linéaire, un troisième moment d'échantillonnage est déterminé dans le futur, auquel un autre paramètre de tension est déterminé. Sur la base du troisième moment d'échantillonnage, un événement d'inspection est planifié. Un avantage de l'invention est que des événements d'inspection sont programmés de façon adaptative d'une manière qui est sensible à la différence de valeurs de ces mesures, mais qui tient compte de l'incertitude inhérente dans de telles mesures sans compromettre la sécurité. De cette manière, des événements d'inspection peuvent être programmés moins fréquemment, ce qui est actuellement le cas qui présente un coût de maintenance beaucoup plus réduit et qui assure toujours l'intégrité du raccordement boulonné.
An unhandled error has occurred. Reload 🗙