WO2024260524 - METHOD FOR INSTALLING A SERVICE LIFT IN A MULTI-PART WIND TURBINE TOWER
National phase entry is expected:
Publication Number
WO/2024/260524
Publication Date
26.12.2024
International Application No.
PCT/DK2024/050145
International Filing Date
18.06.2024
Title **
[English]
METHOD FOR INSTALLING A SERVICE LIFT IN A MULTI-PART WIND TURBINE TOWER
[French]
PROCÉDÉ D'INSTALLATION D'UN ASCENSEUR DE SERVICE DANS UNE TOUR ÉOLIENNE EN PLUSIEURS PARTIES
Applicants **
VESTAS WIND SYSTEMS A/S
Hedeager 42
8200 Aarhus N, DK
Inventors
HEYDENREICH, Jesper
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
JOHANSEN, Søren Vestergaard Ranch
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
NIELSEN, Martin Werner
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
Priority Data
PA202370336
23.06.2023
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 1461 | |
| EPO | Filing, Examination | 8286 | |
| Japan | Filing | 533 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 3635 |

Total: 14490 USD
Abstract[English]
A method of installing a service lift (22) in a wind turbine tower (12) is provided. The wind turbine tower (12) includes an upper tower portion (32) that is configured to be connected to a lower tower portion (30) to form the wind turbine tower (12). The method includes providing an upper tower stand (36) at a tower pre- assembly site (34) and providing the upper tower stand (36) with the service lift (22). The method includes connecting the upper tower portion (30) of the wind turbine tower (12) to the upper tower stand (36) so that the upper tower portion (30) is supported on the upper tower stand (36), and connecting the service lift (22) in the upper tower stand (36) to the upper tower portion (30) of the wind turbine tower (12) so that the service lift (22) is operational within the upper tower portion (30). The method further includes operating the service lift (22) within the upper tower portion (30) of the wind turbine tower (12) and securing the service lift (22) to the upper tower portion (30) at a location vertically spaced from the upper tower stand (36) for subsequent assembly of the wind turbine tower (12).[French]
L'invention concerne un procédé d'installation d'un ascenseur de service (22) dans une tour d'éolienne (12). La tour d'éolienne (12) comprend une partie de tour supérieure (32) qui est conçue pour être reliée à une partie de tour inférieure (30) pour former la tour d'éolienne (12) en entier. Le procédé comprend la disposition d'un support de tour supérieur (36) au niveau d'un site de pré-assemblage de tour (34) et la disposition du support de tour supérieur (36) avec l'ascenseur de service (22). Le procédé comprend la liaison de la partie de tour supérieure (30) de la tour d'éolienne (12) au support de tour supérieur (36) de telle sorte que la partie de tour supérieure (30) soit supportée sur le support de tour supérieur (36), et la liaison de l'ascenseur de service (22) dans le support de tour supérieur (36) à la partie de tour supérieure (30) de la tour d'éolienne (12) de telle sorte que l'ascenseur de service (22) soit opérationnel à l'intérieur de la partie de tour supérieure (30). Le procédé comprend en outre l'actionnement de l'ascenseur de service (22) à l'intérieur de la partie de tour supérieure (30) de la tour d'éolienne (12) et la fixation de l'ascenseur de service (22) à la partie de tour supérieure (30) à un emplacement espacé verticalement du support de tour supérieur (36) pour l'assemblage ultérieur de la tour d'éolienne (12).