WO2023213368 - CONTROL OF A RENEWABLE ENERGY POWER PLANT TO DETECT A CONTROL FAULT
National phase entry:
Publication Number
WO/2023/213368
Publication Date
09.11.2023
International Application No.
PCT/DK2023/050108
International Filing Date
03.05.2023
Title **
[English]
CONTROL OF A RENEWABLE ENERGY POWER PLANT TO DETECT A CONTROL FAULT
[French]
COMMANDE D'UNE CENTRALE ÉLECTRIQUE À ÉNERGIE RENOUVELABLE POUR DÉTECTER UN DÉFAUT DE COMMANDE
Applicants **
VESTAS WIND SYSTEMS A/S
Hedeager 42
8200 Aarhus N, DK
Inventors
SKJELMOSE, Mads Rajczyk
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
PEREIRA BARREIRA, Ines
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
NAYEBI, Kouroush
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
Priority Data
PA202270234
03.05.2022
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 1160 | |
| EPO | Filing, Examination | 4729 | |
| Japan | Filing | 590 | |
| South Korea | Filing | 574 | |
| USA | Filing, Examination | 2710 |

Total: 9763 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
Aspects of the present invention relate to a method (200) of operating a renewable energy power plant (12) comprising one or more renewable energy generators (14). The method (200) comprises: receiving a measurement signal indicative of a measured power characteristic of the renewable energy power plant (12) at a point of connection (20) to a power network (16); controlling the renewable energy power plant (12) according to a normal mode of operation to provide power by determining and dispatching power set points, the power set points being determined by: acquiring samples of the measurement signal at a sample rate; and determining the power set points based on the sampled measurements and a target level for the measured power characteristic; and monitoring the measurement signal to detect an undersampled oscillation of the measured power characteristic in the sampled measurements, and thereby detecting a control fault; and when the control fault is detected, controlling the renewable energy power plant (12) according to a fault mode of operation.[French]
Des aspects de la présente invention concernent un procédé (200) de fonctionnement d'une centrale électrique à énergie renouvelable (12) comprenant un ou plusieurs générateurs d'énergie renouvelable (14). Le procédé (200) consiste à : recevoir un signal de mesure indiquant une caractéristique de puissance mesurée de la centrale électrique à énergie renouvelable (12) au niveau d'un point de connexion (20) à un réseau électrique (16) ; commander la centrale électrique à énergie renouvelable (12) selon un mode de fonctionnement normal pour fournir une alimentation par détermination et répartition de points de consigne de puissance, les points de consigne de puissance étant déterminés par l'acquisition d'échantillons du signal de mesure à une fréquence d'échantillonnage ; et déterminer des points de consigne de puissance sur la base des mesures échantillonnées et d'un niveau cible pour la caractéristique de puissance mesurée ; et surveiller le signal de mesure pour détecter une oscillation sous-échantillonnée de la caractéristique de puissance mesurée dans les mesures échantillonnées, et détecter ainsi un défaut de commande ; et lorsque le défaut de commande est détecté, commander la centrale électrique à énergie renouvelable (12) selon un mode de fonctionnement défectueux.