WO2023202753 - METHODS AND SYSTEMS FOR CONTROLLING A POWER PLANT DURING NETWORK FREQUENCY FLUCTUATIONS

National phase entry:
Publication Number WO/2023/202753
Publication Date 26.10.2023
International Application No. PCT/DK2023/050091
International Filing Date 03.04.2023
Title **
[English] METHODS AND SYSTEMS FOR CONTROLLING A POWER PLANT DURING NETWORK FREQUENCY FLUCTUATIONS
[French] PROCÉDÉS ET SYSTÈMES DE COMMANDE D'UNE CENTRALE ÉLECTRIQUE LORS DE VARIATIONS DE FRÉQUENCE DE RÉSEAU
Applicants **
VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N, DK
Inventors
WEI, Mu c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
ANDERSEN, Brian W. c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
NAYEBI, Kouroush c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
JENSEN, Kennet Kirk c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
BELAND, Lennart c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
CHRISTENSEN, Leif Svinth c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
SKJELMOSE, Mads Rajczyk c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
SVENDSTRUP-BJERRE, Andreas c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
Priority Data
PA202270204   20.04.2022   DK
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1272
EPO Filing, Examination4977
Japan Filing589
South Korea Filing575
USA Filing, Examination2710
MasterCard Visa

Total: 10123

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] A method (300) and corresponding controller (100) for controlling a power plant, such as a wind power plant (12), which comprises at least one power generator (14). The power plant (12) has a variable available power output at least partly due to variability of an energy source powering the at least one power generator (14). The method (300) comprises receiving (302) a measured frequency of a power network (16) to which the power plant (12) is connected, and determining (304) whether the measured frequency falls within a first frequency sub-band (54, 56, 58, 60) that overlaps a network- defined frequency deadband (52). Based at least in part on the measured frequency, a first control signal is output (306), indicative of either: a first power offset for application to a baseline frequency curve for the power plant (12) to generate a set point for controlling a power characteristic of the power plant (12); or a set point for controlling a power characteristic of the power plant (12), the set point being based on a first power offset applied to a baseline frequency curve for the power plant. The baseline frequency curve may be offset from, and vary with, the available power output.[French] Procédé (300) et dispositif de commande (100) correspondant destinés à commander une centrale électrique, telle qu'un parc éolien (12), qui comprend au moins un générateur d'électricité (14). La centrale électrique (12) comprend une sortie de puissance disponible variable au moins partiellement due à la variabilité d'une source d'énergie alimentant ledit générateur d'électricité (14). Le procédé (300) consiste à recevoir (302) une fréquence mesurée d'un réseau électrique (16) auquel la centrale électrique (12) est connectée, et à déterminer (304) si la fréquence mesurée est comprise dans une première sous-bande de fréquences (54, 56, 58, 60) qui chevauche une zone morte de fréquences définie par le réseau (52). Sur la base, au moins en partie, de la fréquence mesurée, un premier signal de commande est émis (306), indiquant soit : un premier décalage de puissance pour une application à une courbe de fréquence de ligne de base pour la centrale électrique (12) afin de générer un point de consigne pour commander une caractéristique de puissance de la centrale électrique (12); ou un point de consigne pour commander une caractéristique de puissance de la centrale électrique (12), le point de consigne étant basé sur un premier décalage de puissance appliqué à une courbe de fréquence de ligne de base pour la centrale électrique. La courbe de fréquence de ligne de base peut être décalée par rapport à la sortie de puissance disponible et peut varier selon celle-ci.