WO2023165665 - A METHOD FOR CONTROLLING A POWER PLANT

National phase entry:
Publication Number WO/2023/165665
Publication Date 07.09.2023
International Application No. PCT/DK2023/050027
International Filing Date 21.02.2023
Title **
[English] A METHOD FOR CONTROLLING A POWER PLANT
[French] PROCÉDÉ DE COMMANDE D'UNE CENTRALE ÉLECTRIQUE
Applicants **
VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N, DK
Inventors
SKJELMOSE, Mads Rajczyk c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
VALCAN, Dumitru-Mihai c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
Priority Data
PA202270082   02.03.2022   DK
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1220
EPO Filing, Examination4920
Japan Filing594
South Korea Filing575
USA Filing, Examination3310
MasterCard Visa

Total: 10619

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] A method for controlling a power plant (100) comprising one or more wind turbine generators (104) and one or more Power-to-X units (106), the Power-to-X (106) unit being configured to convert electric power from the power plant (100) to X, the power plant (100) being connected to an electric power grid (102). The method comprises: in response to an under-frequency support request with regard to the electric power grid (102), determining (201) to initiate an inertia emulation response period (502b) of the one or more wind turbine generators (104) so as to increase the electric power generation of the wind turbine generator (104) for providing frequency support to the electric power grid (102); and when or after it has been determined to initiate the inertia emulation response period (502b), initiating (203a) an electric power consumption reduction period (502c) of the Power-to-X unit (106) so as to reduce the electric power consumption of the Power-to-X unit (106) to a lower level or zero.[French] La présente invention concerne un procédé de commande d'une centrale électrique (100) comprenant un ou plusieurs aérogénérateurs (104) et une ou plusieurs unités Power-to-X (106), une unité Power-to-X (106) étant configurée pour convertir l'énergie électrique de la centrale électrique (100) en X, la centrale électrique (100) étant connectée à un réseau d'électricité (102). Le procédé consiste à : en réponse à une demande de soutien en sous-fréquence concernant le réseau électrique (102), déterminer (201) l'initiation d'une période de réponse d'émulation d'inertie (502b) du ou des aérogénérateurs (104) afin d'augmenter la production d'énergie électrique de l'aérogénérateur (104) pour fournir un soutien de fréquence au réseau électrique (102) ; et au moment ou après qu'il a été déterminé d'initier la période de réponse d'émulation d'inertie (502b), initier (203a) une période de réduction de la consommation d'énergie électrique (502c) de l'unité Power-to-X (106) afin de réduire la consommation d'énergie électrique de l'unité Power-to-X (106) à un niveau plus bas ou à zéro.
An unhandled error has occurred. Reload 🗙