WO2023126038 - TOWER CRANE FOR PARTIALLY ERECTING A WIND TURBINE AND METHOD OF USING SAME
National phase entry is expected:
Publication Number
WO/2023/126038
Publication Date
06.07.2023
International Application No.
PCT/DK2022/050263
International Filing Date
06.12.2022
Title **
[English]
TOWER CRANE FOR PARTIALLY ERECTING A WIND TURBINE AND METHOD OF USING SAME
[French]
GRUE À TOUR POUR ÉRIGER PARTIELLEMENT UNE ÉOLIENNE ET SON PROCÉDÉ D'UTILISATION
Applicants **
VESTAS WIND SYSTEMS A/S
Hedeager 42
8200 Aarhus N, DK
Inventors
BAUN, Torben Ladegaard
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
NORDLYNG, Peter
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
Priority Data
PA202170678
30.12.2021
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 1678 | |
| EPO | Filing, Examination | 9445 | |
| Japan | Filing | 594 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 4310 |

Total: 16602 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A crane (38) for partially erecting a wind turbine (10) having a tower (12) formed from vertically segmented tower sections (22) and a nacelle (14). The crane (38) includes a central hub (40), a work platform (42) connected to the central hub (40), the work platform (42) having at least one lifting device (178) for assembling the wind turbine tower (12), and a plurality of telescopic legs (44) disposed about a periphery of the central hub (40). Each of the plurality of telescopic legs (44) includes a first end connected to the central hub (40) and a second end having a claw (80) configured to be connected to a wind turbine tower portion (82). Each of the plurality of telescopic legs (44) is movable between a retracted position and an extended position. A method of partially erecting a wind turbine (10) using the crane (38) is also disclosed.[French]
La présente invention concerne une grue (38) pour ériger partiellement une éolienne (10) ayant une tour (12) formée à partir de sections de tour segmentées verticalement (22) et d'une nacelle (14). La grue (38) comprend un moyeu central (40), une plateforme de travail (42) raccordée au moyeu central (40), la plateforme de travail (42) ayant au moins un dispositif de levage (178) pour assembler la tour d'éolienne (12), et une pluralité de pieds télescopiques (44) disposés autour d'une périphérie du moyeu central (40). Chacun de la pluralité de pieds télescopiques (44) comprend une première extrémité raccordée au moyeu central (40) et une seconde extrémité ayant une griffe (80) conçue pour être raccordée à une partie tour d'éolienne (82). Chacun de la pluralité de pieds télescopiques (44) est mobile entre une position rétractée et une position étendue. La présente divulgation concerne également un procédé d'érection partielle d'une éolienne (10) à l'aide de la grue (38).