WO2023083424 - A METHOD FOR PLANNING INSTALLATION OF A WIND TURBINE COMPONENT
National phase entry:
Publication Number
WO/2023/083424
Publication Date
19.05.2023
International Application No.
PCT/DK2022/050181
International Filing Date
06.09.2022
Title **
[English]
A METHOD FOR PLANNING INSTALLATION OF A WIND TURBINE COMPONENT
[French]
PROCÉDÉ DE PLANIFICATION D'INSTALLATION D'UN COMPOSANT D'ÉOLIENNE
Applicants **
VESTAS WIND SYSTEMS A/S
Hedeager 42
8200 Aarhus N, DK
Inventors
KRISTENSEN, Mads Møller
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
BUZDALEK, Sedin
c/o Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N, DK
Priority Data
PA202170548
10.11.2021
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
EPO
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 961 | |
| EPO | Filing, Examination | 4598 | |
| Japan | Filing | 592 | |
| South Korea | Filing | 574 | |
| USA | Filing, Examination | 2710 |

Total: 9435 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A method for planning installation of a wind turbine component, such as a wind turbine blade, of an offshore wind turbine (1) is disclosed. A digital model (7) of the wind turbine (1) is generated, based on input regarding design specifications of at least the tower (2) of the wind turbine (1), and input regarding seabed conditions at a site where the wind turbine (1) is located. Meteorological prediction data related to a predefined future time period and to the site where the wind turbine (1) is located is applied to the digital model (7) of the wind turbine (1), and an estimate for expected tower oscillations during the predefined future time period is generated, based thereon. At least one time slot during the predefined future time period is identified, where the estimated expected tower oscillations are below a predefined threshold value, and installation of the wind turbine component is scheduled during one of the identified time slots.[French]
L'invention concerne un procédé de planification de l'installation d'un composant d'éolienne, tel qu'une pale d'éolienne, d'une éolienne en mer (1). Un modèle numérique (7) de l'éolienne (1) est généré, sur la base d'une entrée concernant des spécifications de conception d'au moins la tour (2) de l'éolienne (1), et d'une entrée concernant des conditions de fond marin au niveau d'un site où l'éolienne (1) est située. Des données de prédiction météorologique associées une période de temps future prédéfinie et au site où l'éolienne (1) est située sont appliquées au modèle numérique (7) de l'éolienne (1), et une estimation pour des oscillations de tour attendues pendant la période de temps future prédéfinie est générée, sur la base de celles-ci. Au moins un intervalle de temps pendant la période de temps future prédéfinie est identifié, dans lequel les oscillations de tour attendues estimées sont inférieures à une valeur seuil prédéfinie, et l'installation du composant d'éolienne est programmée pendant l'un des intervalles de temps identifiés.