WO2023025366 - AUXILIARY CONTROLLER FOR WIND TURBINE CONTROL SYSTEM

National phase entry:
Publication Number WO/2023/025366
Publication Date 02.03.2023
International Application No. PCT/DK2022/050174
International Filing Date 25.08.2022
Title **
[English] AUXILIARY CONTROLLER FOR WIND TURBINE CONTROL SYSTEM
[French] DISPOSITIF DE COMMANDE AUXILIAIRE POUR SYSTÈME DE COMMANDE D'ÉOLIENNE
Applicants **
VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N, DK
Inventors
SUMAN, Rishi c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
KRISHNAN JAMUNA, Karthik c/o Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N, DK
Priority Data
202111038712   26.08.2021   IN
PA202170499   08.10.2021   DK
front page image
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
*
International Searching Authority
*
Applicant's Legal Status
*
*
*
*
*
Entry into National Phase under
*
Translation

Recalculate

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing1193
EPO Filing, Examination4901
Japan Filing587
South Korea Filing606
USA Filing, Examination2710
MasterCard Visa

Total: 9997

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Abstract[English] The disclosure relates to a method, as well as a related wind turbine and computer program product, for use with a wind turbine comprising a wind turbine controller. The method comprises determining the wind turbine to be in a first operational state, and operating a control system of the wind turbine using the wind turbine controller. The method further comprises determining the wind turbine to be in a second operational state, and operating the control system using an auxiliary controller. Operating the control system using the auxiliary controller comprises receiving a first control signal for the control system from the wind turbine controller, transmitting a feedback signal to the wind turbine controller in accordance with the first control signal, and transmitting a second control signal to the control system as a substitute for the first control signal.[French] La divulgation concerne un procédé, ainsi qu'une éolienne et un produit programme d'ordinateur associés, destiné à être utilisés avec une éolienne comprenant un dispositif de commande d'éolienne. Le procédé consiste à déterminer que l'éolienne se trouve dans un premier état opérationnel, et à faire fonctionner un système de commande de l'éolienne à l'aide du dispositif de commande d'éolienne. Le procédé consiste en outre à déterminer que l'éolienne se trouve dans un second état opérationnel, et à faire fonctionner le système de commande à l'aide d'un dispositif de commande auxiliaire. Le fonctionnement du système de commande à l'aide du dispositif de commande auxiliaire consiste à recevoir un premier signal de commande pour le système de commande provenant du dispositif de commande d'éolienne, transmettre un signal de rétroaction au dispositif de commande d'éolienne en fonction du premier signal de commande, et transmettre un second signal de commande au système de commande en tant que substitut du premier signal de commande.
An unhandled error has occurred. Reload 🗙