WO2026061546 - PIPELINE LOWERING ASSEMBLY LINE AND PIPE LOWERING METHOD
National phase entry:
Publication Number
WO/2026/061546
Publication Date
26.03.2026
International Application No.
PCT/CN2025/125677
International Filing Date
30.09.2025
Title **
[English]
PIPELINE LOWERING ASSEMBLY LINE AND PIPE LOWERING METHOD
[French]
LIGNE D'ASSEMBLAGE D'ABAISSEMENT DE CONDUITE ET PROCÉDÉ D'ABAISSEMENT DE TUYAU
[Chinese]
一种管线下管流水线及下管方法
Applicants **
XU, Xinqing
XU, Jiajing
Inventors
XU, Xinqing
XU, Jiajing
Priority Data
202422810160.4
19.11.2024
CN
202411648667.2
19.11.2024
CN
202521821346.8
26.08.2025
CN
202511200148.4
26.08.2025
CN
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
CNIPA
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1741 | |
| EPO | Filing, Examination, Granting | 8677 | |
| Japan | Filing, Examination, Granting | 1937 | |
| South Korea | Filing, Examination, Granting | 1767 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
18,862
Contact Us
Abstract[English]
A pipeline lowering assembly line and a pipe lowering method. A flat-terrain assembly line is arranged at the front end of a starting end of trench excavation, and a conveying device (1) is laid from the front end to the starting end of the trench excavation. From the front end of the trench excavation to the starting end thereof, the conveying device (1) is sequentially connected in series to a pipeline frame (2), a welding platform (3), an inspection platform (4), a joint coating platform (5), a limiting platform (6), a trench support (7) and a puller (8). By means of the connection between the puller (8) and an excavator, trench excavation and pipe lowering are carried out synchronously. A mountain-terrain assembly line is arranged in a trench that has been excavated in mountain terrain. The mountain-terrain assembly line is provided with a laying device (1A) from a lower slope to a higher slope. The laying device (1A) is sequentially connected in series to a reciprocating platform (2A), a welding platform (3A), an inspection platform (4A) and a joint coating platform (5A). The mountain-terrain assembly line is provided with pipeline brackets (6A) in gaps between the reciprocating platform (2A), the welding platform (3A), the inspection platform (4A) and the joint coating platform (5A) and inside the trench above the laying device (1A). The trench is provided with a winch (7A) at the top of a slope.[French]
L'invention concerne une ligne d'assemblage d'abaissement de conduite et un procédé d'abaissement de tuyau. Une ligne d'assemblage sur terrain plat est disposée à l'extrémité avant d'une extrémité de départ de la tranchée en excavation, et un dispositif de transport (1) est disposé entre l'extrémité avant et l'extrémité de départ de la tranchée en excavation. Entre l'extrémité avant de la tranchée en excavation et l'extrémité de départ de celle-ci, le dispositif de transport (1) est relié séquentiellement en série à un cadre de conduite (2), à une plate-forme de soudage (3), à une plate-forme d'inspection (4), à une plate-forme de revêtement de jonction (5), à une plate-forme de limitation (6), à un support de tranchée (7) et à un extracteur (8). Au moyen de la liaison entre l'extracteur (8) et une excavatrice, la tranchée en excavation et l'abaissement de tuyau sont réalisés de manière synchrone. Une ligne d'assemblage sur terrain montagneux est disposée dans une tranchée qui a été excavée dans un terrain montagneux. La ligne d'assemblage sur terrain montagneux est dotée d'un dispositif de pose (1A) entre une pente inférieure et une pente supérieure. Le dispositif de pose (1A) est relié séquentiellement en série à une plate-forme à mouvement alternatif (2A), à une plate-forme de soudage (3A), à une plate-forme d'inspection (4A) et à une plate-forme de revêtement de jonction (5A). La ligne d'assemblage sur terrain montagneux est dotée de supports de conduite (6A) dans des espaces entre la plate-forme à mouvement alternatif (2A), la plate-forme de soudage (3A), la plate-forme d'inspection (4A) et la plate-forme de revêtement de jonction (5A) et à l'intérieur de la tranchée au-dessus du dispositif de pose (1A). La tranchée est dotée d'un treuil (7A) au niveau de la partie supérieure d'une pente.[Chinese]
一种管线下管流水线及下管方法。平原流水线设置于管沟开挖起始端的前端,并由前端向管沟开挖起始端布设有输送装置(1),输送装置(1)由管沟开挖的前端向起始端依次串联有:管线架(2)、焊接平台(3)、探伤平台(4)、补口平台(5)、限位平台(6)、管沟支架(7)和牵引器(8),通过牵引器(8)与挖掘机连接,同步进行管沟开挖与下管。山地流水线设置于山地已开挖完成的管沟中,山地流水线由低坡向高坡设置有铺设装置(1A),铺设装置(1A)依次串联有:往复平台(2A)、焊接平台(3A)、探伤平台(4A)和补口平台(5A);山地流水线在往复平台(2A)、焊接平台(3A)、探伤平台(4A)、补口平台(5A)的间隔中以及铺设装置(1A)向上的管沟内部布设有管线托架(6A);管沟在坡顶处设有卷扬机(7A)。