WO2024037102 - THE UTILITY MODEL RELATES TO AN INTEGRAL PREFABRICATED GUTTER INSTALLATION ADJUSTING DEVICE
National phase entry is expected:
Publication Number
WO/2024/037102
Publication Date
22.02.2024
International Application No.
PCT/CN2023/097021
International Filing Date
30.05.2023
Title **
[English]
THE UTILITY MODEL RELATES TO AN INTEGRAL PREFABRICATED GUTTER INSTALLATION ADJUSTING DEVICE
[French]
MODÈLE D'UTILITÉ SE RAPPORTANT À UN DISPOSITIF D'AJUSTEMENT D'INSTALLATION DE GOUTTIÈRE PRÉFABRIQUÉ INTÉGRÉ
Applicants **
OVERSEAS ENGINEERING COMPANY OF CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
Inventors
WU, Guifa
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
BU, Zhuqing
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
WANG, Jinjin
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
ZHANG, Liang
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
SU, Wu
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
ZHOU, Jian
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
YANG, Jialin
23 Zaoshan Road, Yunyan District
Guiyang, Guizhou 550000, CN
Priority Data
202310364598.1
07.04.2023
CN
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| * | |
International Searching Authority |
CNIPA
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Translation |
|
Recalculate
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing | 938 | |
| EPO | Filing, Examination | 6447 | |
| Japan | Filing | 531 | |
| South Korea | Filing | 575 | |
| USA | Filing, Examination | 3235 |

Total: 11726 USD
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
The invention discloses an integral prefabricated gutter installation adjusting device, which comprises 1, horizontal adjusting device: 2, vertical adjusting device: 3, laser horizontal centering device. Step 1 includes: Rotate the horizontal adjustment handle, drive the horizontal rod to move parallel through the inner thread of the bearing, and connect the prefabricated ditch with a pull belt to adjust the horizontal movement of the prefabricated ditch. Step 2 includes: foot type air pressure pump lifting adjustment device, through the aeration and air discharge to raise and lower the vertical rod, adjust the vertical movement of the prefabricated ditch. Step 3 includes: Adjust the laser to the center line of the template by performing steps 1 and 2 to ensure accurate and rapid installation of the gutter. The invention has the advantages of simple operation, large reduction of equipment and manpower input, mature technology, safety, reliability and high efficiency.[French]
L'invention divulgue un dispositif d'ajustement d'installation de gouttière préfabriqué intégré, qui comprend 1, un dispositif d'ajustement horizontal ; 2, un dispositif d'ajustement vertical ; 3, un dispositif de centrage horizontal laser. L'étape 1 consiste à : faire tourner la poignée d'ajustement horizontal, entraîner la tige horizontale pour qu'elle se déplace parallèlement à travers le filetage interne du palier, et relier le fossé préfabriqué à une courroie de traction pour ajuster le mouvement horizontal du fossé préfabriqué. L'étape 2 consiste à : à l'aide d'un dispositif d'ajustement de levage de pompe à pression d'air de type à pied, par l'aération et l'évacuation d'air pour élever et abaisser la tige verticale, ajuster le mouvement vertical du fossé préfabriqué. L'étape 3 consiste à : ajuster le laser selon la ligne centrale du gabarit par réalisation des étapes 1 et 2 pour assurer une installation précise et rapide de la gouttière. L'invention présente les avantages d'un fonctionnement simple, d'une réduction importante de l'équipement et de la main-d'œuvre, d'une technologie établie, d'une sécurité, d'une fiabilité et d'une efficacité élevée.