WO2025238560 - UE-INITIATED BEAM MANAGEMENT MEASUREMENT REPORTING

National phase entry is expected:
Publication Number WO/2025/238560
Publication Date 20.11.2025
International Application No. PCT/IB2025/055024
International Filing Date 13.05.2025
Title **
[English] UE-INITIATED BEAM MANAGEMENT MEASUREMENT REPORTING
[French] RAPPORT DE MESURE DE GESTION DE FAISCEAU INITIÉ PAR UN UE
Applicants **
NOKIA TECHNOLOGIES OY
Inventors
SIVANESAN, Kathiravetpillai
CAPORAL DEL BARRIO, Samantha
RAJAPAKSHALAGE, Dhanushka Nalin Jayaweera
YUK, Youngsoo
ENESCU, Mihai
Priority Data
2406939.5   16.05.2024   GB
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
译文

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2663
EPO Filing, Examination, Granting17283
Japan Filing, Examination, Granting2678
South Korea Filing, Examination, Granting3131
USA Filing, Examination, Granting9540
MasterCard Visa
Total: 35,295
Contact Us
Abstract[English] Example embodiments of the present disclosure are directed to UE-initiated beam management measurement reporting. A method comprises after a transmission of a first report for beam management that is initiated by the first apparatus, transmitting, at a first apparatus and to a second apparatus, a second report for the beam management indicating at least one of: a measurement result of a measurement used in the beam management, a triggering event for the beam management, or a transmission configuration indicator state corresponding to reference signals for measurement; and monitoring response information for the second report for the beam management.[French] Des modes de réalisation données à titre d'exemple de la présente divulgation concernent un rapport de mesure de gestion de faisceau initié par un UE. Un procédé comprend les étapes suivantes : après la transmission d'un premier rapport pour la gestion de faisceau qui est initié par le premier appareil, transmission, au niveau d'un premier appareil et à un second appareil, d'un second rapport pour la gestion de faisceau indiquant un résultat de mesure d'une mesure utilisée dans la gestion de faisceau, et/ou un événement de déclenchement pour la gestion de faisceau, et/ou un état d'indicateur de configuration de transmission correspondant à des signaux de référence pour une mesure ; et surveillance d'informations de réponse pour le second rapport pour la gestion de faisceau.