WO2025224617 - LOAD GUIDE FOR WIND TURBINE
National phase entry is expected:
Publication Number
WO/2025/224617
Publication Date
30.10.2025
International Application No.
PCT/IB2025/054189
International Filing Date
22.04.2025
Title **
[English]
LOAD GUIDE FOR WIND TURBINE
[French]
GUIDE DE CHARGE POUR ÉOLIENNE
Applicants **
LIFTOFF HOLDING B.V.
Inventors
MAIJ, Eelko
FICKER, Gerardus Bernardus Franciscus Heleen
BOTER, Hubert
AMIN, Ziad
Priority Data
63/637,176
22.04.2024
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2137 | |
| EPO | Filing, Examination, Granting | 8907 | |
| Japan | Filing, Examination, Granting | 2186 | |
| South Korea | Filing, Examination, Granting | 2135 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
20,105
Contact Us
Abstract[English]
A lifting system for lifting a wind turbine component includes: a first lifting device situated in a nacelle of the wind turbine, the first lifting device connectable by a first lifting line to the wind turbine component for lifting and lowering the wind turbine component; a second lifting device; and, a load guide connected to the second lifting device by a second lifting line to be liftable and lowerable by the second lifting device. The load guide includes: a rigid ring that extends at least partially around a perimeter of a tower of the wind turbine; a plurality of rollers mounted on the ring, each of the plurality of rollers configured to rollingly contact the tower and roll on the tower as the load guide moves vertically along the tower; and, one or more load connectors configured to receive and support the wind turbine component on the load guide.[French]
L'invention concerne un système de levage pour lever un composant d'éolienne. Ledit système de levage comprend : un premier dispositif de levage situé dans une nacelle de l'éolienne, ledit premier dispositif de levage pouvant être relié par une première ligne de levage au composant d'éolienne pour lever et abaisser le composant d'éolienne ; un second dispositif de levage ; et un guide de charge relié au second dispositif de levage par une seconde ligne de levage pour pouvoir être soulevé et abaissé par le second dispositif de levage. Le guide de charge comprend : une bague rigide qui s'étend au moins partiellement autour d'un périmètre d'une tour de l'éolienne ; une pluralité de rouleaux montés sur la bague, chacun de la pluralité de rouleaux étant configuré pour entrer en contact roulant avec la tour et rouler sur la tour lorsque le guide de charge se déplace verticalement le long de la tour ; et un ou plusieurs connecteurs de charge configurés pour recevoir et supporter le composant d'éolienne sur le guide de charge.