WO2025172750 - NETWORK- OR UE-CONTROLLED RESUMPTION OF RADIO RESOURCE MANAGEMENT MEASUREMENTS IN MEASUREMENT WINDOWS
National phase entry is expected:
Publication Number
WO/2025/172750
Publication Date
21.08.2025
International Application No.
PCT/IB2024/061809
International Filing Date
25.11.2024
Title **
[English]
NETWORK- OR UE-CONTROLLED RESUMPTION OF RADIO RESOURCE MANAGEMENT MEASUREMENTS IN MEASUREMENT WINDOWS
[French]
REPRISE, COMMANDÉE PAR RÉSEAU OU PAR UE, DE MESURES DE GESTION DE RESSOURCES RADIOÉLECTRIQUES DANS DES FENÊTRES DE MESURES
Applicants **
NOKIA TECHNOLOGIES OY
Inventors
SONG, Jian
PARIS, Stefano
HARRIS, John
KAIKKONEN, Jorma Johannes
GAPEYENKO, Margarita
Priority Data
20245146
13.02.2024
FI
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2052 | |
| EPO | Filing, Examination, Granting | 8376 | |
| Japan | Filing, Examination, Granting | 2092 | |
| South Korea | Filing, Examination, Granting | 1942 | |
| USA | Filing, Examination, Granting | 7140 |

Total:
21,602
Contact Us
Abstract[English]
Techniques are provided, which enable network-controlled or User Equipment (UE)- controlled resumption of Radio Resource Measurement (RRM) measurements in a next measurement window (e.g., a Measurement Gap (MG) or Synchronization Signal (SS)/Physical Broadcast Channel (PBCH) Block Measurement Timing Configuration (SMTC) window) after receiving a skipping command. According to the techniques, either a UE or a network node is configured to evaluate whether at least one condition for resuming the RRM measurements in the next measurement window is satisfied during a pre-defined evaluation timer. If this is the case, the UE may decide itself or be instructed by the network node to ignore the skipping command and resume the RRM measurements in the next measurement window.[French]
La présente invention concerne des techniques qui permettent une reprise, commandée par un équipement d’utilisateur (UE) ou par un réseau, de mesures de ressources radioélectriques (RRM) dans une prochaine fenêtre de mesures (par exemple, un intervalle de mesure (MG) ou une fenêtre SMTC (fenêtre de configuration de temps de mesure de bloc de canal physique de diffusion (PBCH)/de signal de synchronisation (SS)) après réception d'une commande de saut. Selon les techniques, soit un UE, soit un nœud de réseau, est configuré pour évaluer si au moins une condition pour reprendre les mesures RRM dans la prochaine fenêtre de mesures est satisfaite pendant une temporisation d'évaluation prédéfini. Si tel est le cas, l'UE peut décider lui-même ou recevoir l’ordre du nœud de réseau d’ignorer la commande de saut et de reprendre les mesures RRM dans la prochaine fenêtre de mesures.