WO2022167870 - PREDICTION OF PIPELINE COLUMN SEPARATIONS
National phase entry:
Publication Number
WO/2022/167870
Publication Date
11.08.2022
International Application No.
PCT/IB2022/000107
International Filing Date
08.02.2022
Title **
[English]
PREDICTION OF PIPELINE COLUMN SEPARATIONS
[French]
PRÉDICTION DE SÉPARATIONS DE COLONNES DE PIPELINE
Applicants **
VANMOK INC.
Inventors
JAHROMI, Hamed Ghasvari
Priority Data
63/147,169
08.02.2021
US
17/408,555
23.08.2021
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
CIPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2371 | |
| EPO | Filing, Examination, Granting | 13858 | |
| Japan | Filing, Examination, Granting | 2405 | |
| South Korea | Filing, Examination, Granting | 2578 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
25,952
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
An example operation may include one or more of acquiring real-time parameter data from a pipeline, selecting relevant real-time parameters from the real-time parameter data, executing a plurality of equations using the selected real-time parameters as an in input, generating a model configured to simulate the pipeline in real-time based on an output of the plurality of the equations, and predicting at least one location of a column separation in the pipeline based on the model.[French]
Un exemple de fonctionnement peut comprendre une ou plusieurs étapes consistant à acquérir des données de paramètres en temps réel à partir d'un pipeline, sélectionner des paramètres en temps réel pertinents à partir des données de paramètres en temps réel, exécuter une pluralité d'équations à l'aide des paramètres en temps réel sélectionnés en tant qu'entrée, générer un modèle configuré pour simuler le pipeline en temps réel sur la base d'une sortie de la pluralité des équations, et à prédire au moins un emplacement d'une séparation de colonne dans le pipeline sur la base du modèle.