WO2025257200 - STEUERUNGSSYSTEM FÜR EINE PRODUKTION UND LOGISTIK EINES HERSTELLERS

National phase entry is expected:
Publication Number WO/2025/257200
Publication Date 18.12.2025
International Application No. PCT/EP2025/066139
International Filing Date 10.06.2025
Title **
[German] STEUERUNGSSYSTEM FÜR EINE PRODUKTION UND LOGISTIK EINES HERSTELLERS
[English] CONTROL SYSTEM FOR PRODUCTION AND LOGISTICS OF A MANUFACTURER
[French] SYSTÈME DE COMMANDE POUR LA PRODUCTION ET LA LOGISTIQUE D'UN FABRICANT
Applicants **
ZF FRIEDRICHSHAFEN AG
Inventors
KEHL, Tim
SCHNEIDER, Georg
Priority Data
102024205391.0   12.06.2024   DE
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
译文

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2005
EPO Filing, Examination, Granting8107
Japan Filing, Examination, Granting2122
South Korea Filing, Examination, Granting2004
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 18,978
Contact Us
Abstract[German] Die Erfindung betrifft ein Steuerungssystem (100) für eine Produktion und Logistik eines Herstellers, umfassend zumindest zwei Mittel von einem Produktionsmittel (110) zum Bestimmen eines Produktionsplans, einem Materialplanungsmittel (120) zum Bestimmen einer benötigten Menge an Ressourcen für die Produktion, einem Vorhersagemittel (130) zum Bestimmen eines Abholzeitfensters eines hergestellten Produkts und einem Transportplanungsmittel (140) zum Bestimmen von Transporten für die hergestellten Produkte und zugehörigen Routen, die zum Lösen jeweiliger lokaler Optimierungsproblem ausgebildet sind, wobei die zumindest zwei Mittel (110-140) zum Ausgeben jeweiliger lokaler Lösungsinformationen basierend auf dem jeweiligen lokalen Optimierungsproblem ausgebildet sind, wobei die zumindest zwei Mittel (110- 140) zum erneuten Lösen des jeweiligen lokalen Optimierungsproblems basierend auf der lokalen Lösungsinformation des anderen Mittels und/oder basierend auf einer globalen Lösungsinformation eines auf den lokalen Optimierungsproblemen basierenden globalen Optimierungsproblems ausgebildet sind, wobei die zumindest zwei Mittel (110-140) zum Anpassen des Produktionsplans, der benötigten Menge an Ressourcen, dem Abholzeitfenster und/oder den Transporten und zugehörigen Routen basierend auf dem erneuten Lösen ausgebildet sind.[English] The invention relates to a control system (100) for production and logistics of a manufacturer, the control system comprising at least two modules selected from: a production module (110) for determining a production plan; a materials-planning module (120) for determining a required quantity of resources for production; a prediction module (130) for determining a collection time window for a manufactured product; and a transport-planning module (140) for determining transports for the manufactured products and associated routes, each of these modules being designed to solve a local optimisation problem, wherein each of said at least two modules (110-140) is designed to output local solution information based on its local optimisation problem, wherein each of said at least two modules (110-140) is designed to re-solve its local optimisation problem based on local solution information from another of the modules and/or based on global solution information of a global optimisation problem based on the local optimisation problems, wherein each of said at least two modules (110-140) is designed to adapt the production plan, the required quantity of resources, the collection time window, and/or the transports and associated routes based on said re-solving process.[French] L'invention concerne un système de commande (100) pour la production et la logistique d'un fabricant, le système de commande comprenant au moins deux modules sélectionnés parmi : un module de production (110) pour déterminer un plan de production ; un module de planification de matériaux (120) pour déterminer une quantité de ressources nécessaires pour la production ; un module de prédiction (130) pour déterminer une fenêtre temporelle de collecte pour un produit manufacturé ; et un module de planification de transport (140) pour déterminer les transports pour les produits manufacturés et des itinéraires associés, chacun de ces modules étant conçu pour résoudre un problème d'optimisation local, chacun desdits deux modules au moins (110-140) étant conçu pour émettre des informations de solution locale en fonction de son problème d'optimisation local, chacun desdits deux modules au moins (110-140) étant conçu pour résoudre son problème d'optimisation local en fonction d'informations de solution locale provenant d'un autre des modules et/ou en fonction d'informations de solution globale d'un problème d'optimisation globale en fonction des problèmes d'optimisation locale, chacun desdits deux modules au moins (110-140) étant conçu pour adapter le plan de production, la quantité de ressources nécessaires, la fenêtre temporelle de collecte et/ou les transports et les itinéraires associés en fonction dudit processus de résolution.