WO2023046258 - METHOD FOR GENERATING AN OPTIMIZED PRODUCTION SCHEDULING PLAN IN A FLEXIBLE MANUFACTURING SYSTEM
National phase entry is expected:
Publication Number
WO/2023/046258
Publication Date
30.03.2023
International Application No.
PCT/EP2021/075879
International Filing Date
21.09.2021
Title **
[English]
METHOD FOR GENERATING AN OPTIMIZED PRODUCTION SCHEDULING PLAN IN A FLEXIBLE MANUFACTURING SYSTEM
[French]
PROCÉDÉ DE GÉNÉRATION D'UN PLAN DE PLANIFICATION DE PRODUCTION OPTIMISÉ DANS UN SYSTÈME DE FABRICATION DE FLEXIBLE
Applicants **
SIEMENS AKTIENGESELLSCHAFT
Inventors
BÄR, Schirin
PESCHKE, Jörn
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
* |
| Recordal of a Change of the Applicant's Name/Address | * |
| Type of Assignment | * |
| Applicant's Legal Status | * |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under | * |
| * | |
| * | |
| * | |
| Patent Delivery | * |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1834 | |
| EPO | Filing, Examination, Granting | 8167 | |
| Japan | Filing, Examination, Granting | 1963 | |
| South Korea | Filing, Examination, Granting | 1566 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
18,270
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
The invention relates to a method for generating an optimized production scheduling plan for processing of workpieces in a Flexible Manufacturing System The basic idea of the invention is to observe the behavior of the scheduling system that is currently used within the production system, learn from the observations, and optimize where necessary. This will be done while training a Deep Reinforcement Learning (RL) System for an online scheduling system. The solution supports different local and global optimization goals, e. g. makespan minimization or capacity utilization, which can be adapted independently for each manufactured product[French]
L'invention concerne un procédé de génération d'un plan de planification de production optimisé pour le traitement de pièces dans un système de fabrication de flexible, l'idée de base de l'invention étant d'observer le comportement du système de planification qui est actuellement utilisé dans le système de production, de tirer parti des observations, et d'optimiser si nécessaire. Ceci sera réalisé tout en entraînant un système d'apprentissage de renforcement profond (RL) pour un système de planification en ligne. La solution prend en charge différents objectifs d'optimisation locaux et globaux, par exemple une réduction de la durée d’exécution ou une utilisation de capacité, qui peuvent être adaptées indépendamment pour chaque produit manufacturé.