WO2025098577 - A METHOD AND A CONTROL ARRANGEMENT FOR CONTROLLING A RENEWABLE POWER PLANT
National phase entry is expected:
Publication Number
WO/2025/098577
Publication Date
15.05.2025
International Application No.
PCT/DK2024/050249
International Filing Date
14.10.2024
Title **
[English]
A METHOD AND A CONTROL ARRANGEMENT FOR CONTROLLING A RENEWABLE POWER PLANT
[French]
PROCÉDÉ ET AGENCEMENT DE COMMANDE POUR COMMANDER UNE CENTRALE ÉLECTRIQUE RENOUVELABLE
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
JENSEN, Tue Vissing
RATHA, Anubhav
ADAMSEN, Kræn
Priority Data
PA202330321
08.11.2023
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2286 | |
| EPO | Filing, Examination, Granting | 10318 | |
| Japan | Filing, Examination, Granting | 2247 | |
| South Korea | Filing, Examination, Granting | 2259 | |
| USA | Filing, Examination, Granting | 5340 |

Total:
22,450
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
A method and a control arrangement for controlling a renewable power plant (100) connected to a power grid (116) are presented. The method comprises: - determining (210) a dynamic policy (DP) based on: -- a current state (Scur) of the renewable power plant (100), -- a prediction (Ppred) of a future power production of more than one renewable electric power generating units (103) comprised in the renewable power plant, and -- a risk (λ) for instability at a connection (115) to the power grid (116); - determining (220) one or more power-to-gas reference points (RPP2G) based on: -- an available power (Pav) provided by the more than one renewable electric power generating units (103), and -- the determined dynamic policy (DP); and - providing (230) the determined one or more power-to-gas reference points (RPP2G) to at least one power-to-gas unit (120).[French]
L'invention concerne un procédé et un agencement de commande pour commander une centrale électrique renouvelable (100) connectée à un réseau électrique (116). Le procédé consiste à : - déterminer (210) une politique dynamique (DP) basée sur : -- un état actuel (Scur) de la centrale électrique renouvelable (100), -- une prévision (Ppred) d'une production d'électricité future de plus d'une unité de production d'électricité renouvelable (103) comprise dans la centrale électrique renouvelable, et -- un risque (λ) d'instabilité au niveau d'une connexion (115) au réseau électrique (116) ; - déterminer (220) un ou plusieurs points de référence de conversion électricité-gaz (RPP2G) basés sur : -- une puissance disponible (Pav) fournie par les unités de production d'électricité renouvelable (103), et -- la politique dynamique déterminée (DP) ; et - fournir (230) le ou les points de référence de conversion électricité-gaz (RPP2G) à au moins une unité de conversion électricité-gaz.