WO2023237165 - A WIND POWER PLANT
National phase entry:
Publication Number
WO/2023/237165
Publication Date
14.12.2023
International Application No.
PCT/DK2023/050137
International Filing Date
08.06.2023
Title **
[English]
A WIND POWER PLANT
[French]
PARC ÉOLIEN
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
NIELSEN, Jesper
Priority Data
PA202270304
09.06.2022
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| 译文 |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2111 | |
| EPO | Filing, Examination, Granting | 9659 | |
| Japan | Filing, Examination, Granting | 2247 | |
| South Korea | Filing, Examination, Granting | 2259 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
21,016
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
A wind power plant comprising a plurality of wind turbine clusters, wherein each wind turbine cluster includes a plurality of wind turbine generators connected to a connection station by an intra-cluster power network, each wind turbine generator being connected to the connection station by a respective one of a plurality of first switchgear devices of the connection station. Each of the plurality of wind turbine clusters are connected, by their respective connection stations, to an inter-cluster power network, by a respective one of a plurality of cluster transformers and a respective one of a plurality of second switchgear devices. The power plant also includes a control system operatively connected to the second switchgear devices of the plurality of wind turbine clusters, and wherein the control system is configured to identify the existence of a no-generation condition affecting at least one of the plurality of wind turbine clusters; control the switch status of the second switchgear devices, based on the identification, to control the connection status of each of the plurality of wind turbine clusters to the inter-cluster power network so as to reduce no load losses of the wind turbine clusters.[French]
L'invention concerne un parc éolien comprenant une pluralité de groupes d'éoliennes dont chacun comprend une pluralité de générateurs éoliens connectés à une station de connexion par un réseau d'alimentation intra-groupe. Chaque générateur éolien est connecté à la station de connexion par un dispositif respectif d'une pluralité de premiers dispositifs d'appareillage de commutation de la station de connexion. Chacun de la pluralité de groupes d'éoliennes est connecté, par leurs stations de connexion respectives, à un réseau d'alimentation inter-groupe, par un transformateur respectif d'une pluralité de transformateurs de groupe et un dispositif respectif d'une pluralité de seconds dispositifs d'appareillage de commutation. Le parc éolien comprend également un système de commande connecté fonctionnellement aux seconds dispositifs de commutation de la pluralité de groupes d'éoliennes, et le système de commande est conçu pour identifier l'existence d'une condition de non-production affectant au moins l'un de la pluralité de groupes d'éoliennes; et commander l'état de commutation des seconds dispositifs de commutation, sur la base de l'identification, pour commander l'état de connexion de chacun de la pluralité de groupes d'éoliennes au réseau d'alimentation inter-groupe de façon à réduire aucune perte de charge des groupes d'éoliennes.