WO2023177826 - SHIPMENT TRACKING SYSTEM PROVIDING MONITORING OF ACCESS TO A CLOSED SHIPPING CONTAINER OR CARGO SPACE
National phase entry:
Publication Number
WO/2023/177826
Publication Date
21.09.2023
International Application No.
PCT/US2023/015425
International Filing Date
16.03.2023
Title **
[English]
SHIPMENT TRACKING SYSTEM PROVIDING MONITORING OF ACCESS TO A CLOSED SHIPPING CONTAINER OR CARGO SPACE
[French]
SYSTÈME DE SUIVI D'EXPÉDITION FOURNISSANT UNE SURVEILLANCE D'ACCÈS À UN CONTENEUR D'EXPÉDITION FERMÉ OU À UN ESPACE DE CHARGEMENT
Applicants **
OVERHAUL GROUP, INC.
Inventors
CONLON, Barry
HEIKKINEN, Nicholas
Priority Data
63/320,486
16.03.2022
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
USPTO
* |
| * | |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2225 | |
| EPO | Filing, Examination, Granting | 12102 | |
| Japan | Filing, Examination, Granting | 2199 | |
| South Korea | Filing, Examination, Granting | 2068 | |
| USA | Filing, Examination, Granting | 4310 |

Total:
22,904
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Abstract[English]
A method includes receiving, at a server, a first message including identifying information about a container with an access door seal being monitored by a first ARM device. The method includes initiating tracking of the shipment and first ARM device. The method includes, in response to receiving a second ARM device message indicating an unsealed status of the access door being monitored, comparing the actual time and location at which the ARM device detected unsealing of the access door to the expected unseal time and location. The method includes, in response to the actual time and location not being within a threshold range of the expected time and location, determining that an unexpected/unscheduled unseal event has occurred with the shipping container. The method includes generating and transmitting notifications alerting the operator and at least one interested party identified with the shipment of an unexpected/unscheduled unseal event.[French]
Un procédé consiste à recevoir, au niveau d'un serveur, un premier message comprenant l'identification d'informations concernant un conteneur avec un joint de porte d'accès surveillé par un premier dispositif ARM. Le procédé consiste à déclencher le suivi de l'expédition et du premier dispositif ARM. Le procédé consiste, en réponse à la réception d'un second message de dispositif ARM indiquant un état non scellé de la porte d'accès surveillée, à comparer l'heure et l'emplacement réels au niveau desquels le dispositif ARM a détecté le descellement de la porte d'accès à l'heure et à l'emplacement de descellement attendus. Le procédé consiste, en réponse au fait que l'heure et l'emplacement réels ne se situent pas dans une plage de seuils de l'heure et de l'emplacement attendus, à déterminer qu'un événement de descellement inattendu/non planifié s'est produit avec le conteneur d'expédition. Le procédé consiste à générer et à transmettre des notifications alertant l'opérateur et au moins une partie intéressée identifiée avec l'expédition d'un événement de descellement inattendu/non planifié.