WO2023048586 - INFINITE RING ROTATION IN THE PRODUCTION OF MECHANICAL ENERGY
National phase entry is expected:
Publication Number
WO/2023/048586
Publication Date
30.03.2023
International Application No.
PCT/RS2021/000014
International Filing Date
11.10.2021
Title **
[English]
INFINITE RING ROTATION IN THE PRODUCTION OF MECHANICAL ENERGY
[French]
ROTATION INFINIE D'ANNEAU DANS LA PRODUCTION D'ÉNERGIE MÉCANIQUE
Applicants **
TESLA, Tomislav
Inventors
TESLA, Tomislav
Priority Data
P-2021/1174
21.09.2021
RS
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2090 | |
| EPO | Filing, Examination, Granting | 7032 | |
| Japan | Filing, Examination, Granting | 2277 | |
| South Korea | Filing, Examination, Granting | 2233 | |
| USA | Filing, Examination, Granting | 13140 |

Total:
26,772
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
The hydroelectric power plant works as follows. Equilibrium is established and the rotation of the metal ring (1) with the position of the bearings (15) on the structure (14) is centered. The blocking (29) of the operation of the ring (1) is such that the penetration of water from the pool (4) towards the storage (21) is hermetically closed. The ring speed controller (18) with software control is ready to control the rotation of the ring (1). The roller plates (17) have the function of allowing the ring (1) to rotate, and to prevent the penetration of water from the pool (4) towards the storage (21). The pool (4) is filled with water from the outside of the hydropower plant. When the pool (4) is filled to the water level (5), the hydropower plant is ready for operation. The lock (29) is hydraulically moved from the surface of the ring (1), the speed regulator (18) is active, the ring (1) begins to rotate under the influence of buoyancy force, monitoring is done from the engine room (13). The buoyancy force is equal to the ratio of the trapped air (2) in the ring (1) and the water level in the pool (4). The wheels (25) transfer the obtained mechanical energy from the outer surface of the ring (1) to the gearboxes with generators (27) via the system (26) for transmission. The ratio of the obtained mechanical energy from the rotation of the ring (1), and the produced electricity in a series of installed generators (27) is controlled by the regulator (18). The regulator (18) controls that the ring (1) does not stop, and that it has a constant speed of rotation. The position of the broom (20) is required to mechanically clean the water from the outer surface of the ring (1) when it rotates. The collected water from the storage (21) is periodically returned by pumping into the pool (4), so that the difference (28) of the water level in the pool (4) remains the same. Thus the ring (1) had an unlimited useful rotation without consuming additional energy.[French]
Selon l'invention, la centrale hydroélectrique fonctionne comme suit. L'équilibre est établi et la rotation de l'anneau métallique (1) avec la position des paliers (15) sur la structure (14) est centrée. Le blocage (29) du fonctionnement de l'anneau (1) est tel que la pénétration de l'eau du bassin (4) vers le stockage (21) est bloquée hermétiquement. Le contrôleur de vitesse de l'anneau (18) à commande logicielle est prêt à commander la rotation de l'anneau (1). Les plaques à rouleaux (17) ont la fonction de permettre la rotation de l'anneau (1) et d'empêcher la pénétration d'eau du bassin (4) vers le stockage (21). Le bassin (4) est rempli d'eau depuis l'extérieur de la centrale hydroélectrique. Lorsque le bassin (4) est rempli jusqu'au niveau d'eau (5) déterminé, la centrale hydroélectrique est prête à fonctionner. Le verrou (29) est déplacé hydrauliquement à partir de la surface de l'anneau (1), le régulateur de vitesse (18) est actif, l'anneau (1) commence à tourner sous l'influence de la force de flottabilité, la surveillance est effectuée depuis la salle des machines (13). La force de flottabilité est égale au rapport entre l'air piégé (2) dans l'anneau (1) et le niveau d'eau dans le bassin (4). Les roues (25) transfèrent l'énergie mécanique obtenue de la surface externe de l'anneau (1) aux boîtes d'engrenages avec des générateurs (27) par l'intermédiaire du système (26) de transmission. Le rapport entre l'énergie mécanique obtenue à partir de la rotation de l'anneau (1) et l'électricité produite dans une série de générateurs (27) installés est régulé par le régulateur (18). Le régulateur (18) contrôle que l'anneau (1) ne s'arrête pas et que sa vitesse de rotation est constante. Le positionnement du balai (20) est nécessaire pour nettoyer mécaniquement l'eau de la surface externe de l'anneau (1) lorsqu'il tourne. L'eau collectée provenant du stockage (21) est renvoyée périodiquement par pompage dans le bassin (4), de sorte que la différence (28) de niveau d'eau dans le bassin (4) reste la même. L'anneau (1) présente ainsi une rotation utile illimitée, sans consommer d'énergie supplémentaire.