WO2023149101 - WEATHER OBSERVATION SYSTEM, WEATHER OBSERVATION METHOD, TRAINED MODEL GENERATION METHOD, AND PROGRAM
National phase entry:
Publication Number
WO/2023/149101
Publication Date
10.08.2023
International Application No.
PCT/JP2022/046247
International Filing Date
15.12.2022
Title **
[English]
WEATHER OBSERVATION SYSTEM, WEATHER OBSERVATION METHOD, TRAINED MODEL GENERATION METHOD, AND PROGRAM
[French]
SYSTÈME D'OBSERVATION MÉTÉOROLOGIQUE, PROCÉDÉ D'OBSERVATION MÉTÉOROLOGIQUE, PROCÉDÉ DE GÉNÉRATION DE MODÈLE ENTRAÎNÉ, ET PROGRAMME
Applicants **
FURUNO ELECTRIC CO., LTD.
Inventors
MINOWA Masahiro
Priority Data
2022-015474
03.02.2022
JP
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
IP India
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2185 | |
| EPO | Filing, Examination, Granting | 13097 | |
| Japan | Filing, Examination, Granting | 2264 | |
| South Korea | Filing, Examination, Granting | 2303 | |
| USA | Filing, Examination, Granting | 5340 |

Total:
25,189
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
To provide a weather observation system, a weather observation method, a trained model generation method, and a program that can estimate solar radiation or power generation in real time. The weather observation system 1 has an image acquisition unit 11 that acquires an image G1 acquired by a camera 20 that contains at least a sky in an imaging area Ar1, a pixel value acquisition unit 12 that acquires a pixel value G2 of a specific area S6 in the imaging area Ar1, and an estimation unit 10 that generates an estimated value that is correlated with the pixel value G2 using correlation data that represents a relationship between a measured value and the pixel value G2.[French]
Fournir un système d'observation météorologique, un procédé d'observation météorologique, un procédé de génération de modèle entraîné, et un programme, qui peuvent estimer un rayonnement solaire ou une génération d'énergie en temps réel. Le système d'observation météorologique 1 comprend une unité d'acquisition d'image 11 qui acquiert une image G1 acquise par une caméra 20 qui contient au moins un ciel dans une zone d'imagerie Ar1, une unité d'acquisition de valeur de pixel 12 qui acquiert une valeur de pixel G2 d'une zone spécifique S6 dans la zone d'imagerie Ar1, et une unité d'estimation 10 qui génère une valeur estimée qui est corrélée à la valeur de pixel G2 à l'aide de données de corrélation qui représentent une relation entre une valeur mesurée et la valeur de pixel G2.