WO2025238552 - UE-INITIATED BEAM MANAGEMENT MEASUREMENT REPORTING

National phase entry is expected:
Publication Number WO/2025/238552
Publication Date 20.11.2025
International Application No. PCT/IB2025/055015
International Filing Date 13.05.2025
Title **
[English] UE-INITIATED BEAM MANAGEMENT MEASUREMENT REPORTING
[French] RAPPORT DE MESURE DE GESTION DE FAISCEAU LANCÉE PAR UN UE
Applicants **
NOKIA TECHNOLOGIES OY
Inventors
SIVANESAN, Kathiravetpillai
CAPORAL DEL BARRIO, Samantha
RAJAPAKSHALAGE, Dhanushka Nalin Jayaweera
YUK, Youngsoo
ENESCU, Mihai
Priority Data
2406943.7   16.05.2024   GB
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2602
EPO Filing, Examination, Granting16377
Japan Filing, Examination, Granting2636
South Korea Filing, Examination, Granting2976
USA Filing, Examination, Granting9140
MasterCard Visa
Total: 33,731
Contact Us
Abstract[English] Example embodiments of the present disclosure are directed to UE-initiated beam management measurement reporting. A method comprises determining whether a beam management initiated by the first apparatus is triggered based on a measurement result at the first apparatus; based on a determination that the beam management is triggered, transmitting to the second apparatus, the first report for the beam management in a scheduling request that indicates a resource request for a second report for the beam management or indicates a presence of the second report for the beam management; and monitoring response information of the first report for the beam management, the response information comprising an acknowledge of the first report or a set of resources allocated to the second report for the beam management.[French] Des exemples de modes de réalisation de la présente divulgation concernent un rapport de mesure de gestion de faisceau lancée par un UE. Un procédé consiste à déterminer si une gestion de faisceau lancée par le premier appareil est déclenchée sur la base d'un résultat de mesure au niveau du premier appareil ; sur la base d'une détermination selon laquelle la gestion de faisceau est déclenchée, émettre vers le second appareil le premier rapport pour la gestion de faisceau dans une demande de planification qui indique une demande de ressource pour un second rapport pour la gestion de faisceau ou indique une présence du second rapport pour la gestion de faisceau ; et surveiller des informations de réponse du premier rapport pour la gestion de faisceau, les informations de réponse comprenant un accusé de réception du premier rapport ou un ensemble de ressources attribuées au second rapport pour la gestion de faisceau.

Rejoining the server...