WO2025243127 - RESUMING RADIO RESOURCE MANAGEMENT MEASUREMENTS

National phase entry is expected:
Publication Number WO/2025/243127
Publication Date 27.11.2025
International Application No. PCT/IB2025/054748
International Filing Date 06.05.2025
Title **
[English] RESUMING RADIO RESOURCE MANAGEMENT MEASUREMENTS
[French] REPRISE DE MESURES DE GESTION DES RESSOURCES RADIO
Applicants **
NOKIA TECHNOLOGIES OY
Inventors
PARIS, Stefano
KAIKKONEN, Jorma Johannes
SONG, Jian
PEDERSEN, Klaus Ingemann
GAPEYENKO, Margarita
Priority Data
20245643   20.05.2024   FI
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2351
EPO Filing, Examination, Granting9441
Japan Filing, Examination, Granting2169
South Korea Filing, Examination, Granting2050
USA Filing, Examination, Granting5940
MasterCard Visa
Total: 21,951
Contact Us
Abstract[English] The present disclosure relates to an apparatus comprising at least one processor and at least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to perform: Exchanging a configuration enabling resuming of RRM measurements. Transmitting a first indication of RRM measurements resuming capability. Receiving a second indication to skip RRM measurements on at least one subsequent measurement occasion. Receiving a first scheduling indication. Receiving first data corresponding to the first scheduling indication. Transmitting a first HARQ response corresponding to the first data. Receiving a third indication to resume RRM measurements on the at least one subsequent measurement occasion. Receiving a second scheduling indication. Receiving second data corresponding to the second scheduling indication. Transmitting a second HARQ response corresponding to the second data. Performing, in response to at least one criterion being satisfied, RRM measurements on the subsequent measurement occasion.[French] La présente divulgation concerne un appareil qui comprend au moins un processeur et au moins une mémoire stockant des instructions qui, lorsqu'elles sont exécutées par l'au moins un processeur, amènent l'appareil au moins à mettre en œuvre : L'échange d'une configuration permettant de reprendre des mesures de gestion des ressources radio (RRM). La transmission d'une première indication de capacité de reprise de mesures RRM. La réception d'une deuxième indication indiquant d'ignorer des mesures RRM lors d'au moins une occurrence de mesure ultérieure. La réception d'une première indication de planification. La réception de premières données correspondant à la première indication de planification. La transmission d'une première réponse de requête automatique de répétition hybride (HARQ) correspondant aux premières données. La réception d'une troisième indication indiquant de reprendre des mesures RRM lors de ladite au moins une occurrence de mesure ultérieure. La réception d'une deuxième indication de planification. La réception de deuxièmes données correspondant à la deuxième indication de planification. La transmission d'une deuxième réponse HARQ correspondant aux deuxièmes données. La réalisation, en réponse à la satisfaction d'au moins un critère, des mesures RRM lors de l'occurrence de mesure ultérieure.

Rejoining the server...