WO2025150029 - BEAM MANAGEMENT FOR MULTI-TRP VIA BEAM-GROUP REPORTING
National phase entry is expected:
Publication Number
WO/2025/150029
Publication Date
17.07.2025
International Application No.
PCT/IB2025/052740
International Filing Date
14.03.2025
Title **
[English]
BEAM MANAGEMENT FOR MULTI-TRP VIA BEAM-GROUP REPORTING
[French]
GESTION DE FAISCEAU POUR RAPPORT DE GROUPE DE FAISCEAUX PAR L'INTERMÉDIAIRE DE MULTI-TRP
Applicants **
LENOVO (SINGAPORE) PTE. LTD.
Inventors
BARZEGAR KHALILSARAI, Mahdi
HINDY, Ahmed
Priority Data
63/633,462
12.04.2024
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2327 | |
| EPO | Filing, Examination, Granting | 11303 | |
| Japan | Filing, Examination, Granting | 2337 | |
| South Korea | Filing, Examination, Granting | 2350 | |
| USA | Filing, Examination, Granting | 8340 |

Total:
26,657
Contact Us
Abstract[English]
Various aspects of the present disclosure relate to a user equipment (UE) for wireless communication with at least one memory and at least one processor coupled with the at least one memory and configured to cause the UE to receive a configuration message for a beam management procedure, receive, from a set of transmission-reception points (TRPs), a first set of reference signals via a set of wide beams and during the beam management procedure, wherein the first set of reference signals is associated with a first set of reference signal resources, and wherein each beam of the set of wide beams is associated with a corresponding beam identifier, select at least one candidate narrow beam based at least in part on the first set of reference signals received via the set of wide beams, and transmit a report that indicates the at least one candidate narrow beam to a network entity.[French]
Divers aspects de la présente divulgation concernent un équipement utilisateur (UE) pour une communication sans fil avec au moins une mémoire et au moins un processeur couplé à la ou aux mémoires et configuré pour amener l'UE à recevoir un message de configuration pour une procédure de gestion de faisceau, recevoir, à partir d'un ensemble de points d'émission-réception (TRP), un premier ensemble de signaux de référence par l'intermédiaire d'un ensemble de faisceaux larges et pendant la procédure de gestion de faisceau, le premier ensemble de signaux de référence étant associé à un premier ensemble de ressources de signal de référence, et chaque faisceau de l'ensemble de faisceaux larges étant associé à un identifiant de faisceau correspondant, sélectionner au moins un faisceau étroit candidat sur la base, au moins en partie, du premier ensemble de signaux de référence reçus par l'intermédiaire de l'ensemble de faisceaux larges, et transmettre un rapport qui indique le ou les faisceaux étroits candidats à une entité de réseau.