WO2025196551 - ENERGY CONSUMPTION ASSESSMENT FOR DATA CENTER

National phase entry is expected:
Publication Number WO/2025/196551
Publication Date 25.09.2025
International Application No. PCT/IB2025/052174
International Filing Date 28.02.2025
Title **
[English] ENERGY CONSUMPTION ASSESSMENT FOR DATA CENTER
[French] ÉVALUATION DE CONSOMMATION D'ÉNERGIE POUR CENTRE DE DONNÉES
[Chinese] 数据中心用能评估
Applicants **
CLOUD INTELLIGENCE ASSETS HOLDING (SINGAPORE) PRIVATE LIMITED
Inventors
YAN, Yuejun
WANG, Zhaoyang
MA, Jiahao
WANG, Yi
Priority Data
202410336390.3   22.03.2024   CN
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1957
EPO Filing, Examination, Granting11653
Japan Filing, Examination, Granting1740
South Korea Filing, Examination, Granting1201
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 21,291
Contact Us
Abstract[English] Disclosed in the present disclosure are an energy consumption assessment method and apparatus for a data center, an electronic device, and a storage medium. The method comprises: acquiring energy-related parameters and energy storage cost parameters of devices in a data center and task processing parameters for the data center to process computing tasks, and acquiring unit electricity prices in different time periods provided for the data center; establishing an energy management model of the data center on the basis of the acquired energy-related parameters, energy storage cost parameters, task processing parameters, and unit electricity prices in different time periods; and on the basis of the energy management model and a preset maximum energy consumption cost of the data center, calculating electricity power consumption ranges of the data center in the different time periods.[French] La présente divulgation concerne un procédé et un appareil d'évaluation de consommation d'énergie pour un centre de données, un dispositif électronique et un support de stockage. Le procédé consiste à : acquérir des paramètres liés à l'énergie et des paramètres de coût de stockage d'énergie de dispositifs dans un centre de données et des paramètres de traitement de tâche pour que le centre de données traite des tâches informatiques, et acquérir des prix d'électricité unitaires dans différentes périodes de temps fournies pour le centre de données ; établir un modèle de gestion d'énergie du centre de données sur la base des paramètres liés à l'énergie acquis, des paramètres de coût de stockage d'énergie, des paramètres de traitement de tâche et des prix d'électricité unitaires dans différentes périodes de temps ; et sur la base du modèle de gestion d'énergie et d'un coût de consommation d'énergie maximale prédéfini du centre de données, calculer des plages de consommation d'énergie électrique du centre de données dans les différentes périodes de temps.[Chinese] 本公开公开了一种数据中心用能评估方法、装置、电子设备及存储介质,方法包括:获取数据中心中各设备的能量相关参数、储能成本参数和数据中心处理计算任务的任务处理参数,获取为所述数据中心提供的不同时间段的单位电价;根据获取的能量相关参数、储能成本参数、任务处理参数及不同时间段的单位电价,建立所述数据中心的能量管理模型;基于所述能量管理模型和所述数据中心的预设最大用能成本,计算所述数据中心在所述不同时间段的用电功率区间。

Rejoining the server...