WO2025052369 - JOINTLY OPTIMIZE NETWORK AND DEVICE POWER SAVING
National phase entry is expected:
Publication Number
WO/2025/052369
Publication Date
13.03.2025
International Application No.
PCT/IB2024/061574
International Filing Date
19.11.2024
Title **
[English]
JOINTLY OPTIMIZE NETWORK AND DEVICE POWER SAVING
[French]
OPTIMISATION CONJOINTE D'ÉCONOMIE D'ÉNERGIE DE RÉSEAU ET DE DISPOSITIF
Applicants **
LENOVO (SINGAPORE) PTE. LTD.
Inventors
SONI, Tapisha
GANESAN, Karthikeyan
KUCHIBHOTLA, Ravi
Priority Data
63/600,710
19.11.2023
US
18/951,346
18.11.2024
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2331 | |
| EPO | Filing, Examination, Granting | 11068 | |
| Japan | Filing, Examination, Granting | 2329 | |
| South Korea | Filing, Examination, Granting | 2392 | |
| USA | Filing, Examination, Granting | 7740 |

Total:
25,860
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
Various aspects of the present disclosure relate to jointly optimizing network and device power saving. An apparatus, such as a network equipment (NE), establishes an energy savings priority based on network energy savings and user equipment (UE) energy savings. The NE transmits a network energy saving (NES) configuration that is mapped to an NES class to a UE from which the UE establishes a (re)selection priority based at least in part on the network energy savings and the UE energy saving. The UE receives, from the NE as a cell, an indication of the NES configuration mapped to the NES class. The UE determines a remaining active time of the cell based on the NES configuration, and evaluates one or more cell-sleep conditions based on a UE cell-active threshold, a UE cell-sleep threshold, and a UE power saving state supported by the cell.[French]
Divers aspects de la présente divulgation concernent l'optimisation conjointe d'une économie d'énergie de réseau et de dispositif. Un appareil, tel qu'un équipement de réseau (NE), établit une priorité d'économies d'énergie sur la base d'économies d'énergie de réseau et d'économies d'énergie d'équipement utilisateur (UE). Le NE transmet une configuration d'économie d'énergie de réseau (NES) qui est mappée sur une classe NES à un UE à partir de laquelle l'UE établit une priorité de (re)sélection sur la base, au moins en partie, des économies d'énergie de réseau et de l'économie d'énergie d'UE. L'UE reçoit, en provenance du NE en tant que cellule, une indication de la configuration NES mappée sur la classe NES. L'UE détermine un temps actif restant de la cellule sur la base de la configuration NES, et évalue une ou plusieurs conditions de sommeil de cellule sur la base d'un seuil actif de cellule d'UE, d'un seuil de sommeil de cellule d'UE et d'un état d'économie d'énergie d'UE pris en charge par la cellule.