WO2025068979 - TRACK MEASUREMENT REFERENCE POINT CREATION FROM LINEAR NETWORK RAILWAY TRACK MEASUREMENT DATA
National phase entry:
Publication Number
WO/2025/068979
Publication Date
03.04.2025
International Application No.
PCT/IB2024/059480
International Filing Date
27.09.2024
Title **
[English]
TRACK MEASUREMENT REFERENCE POINT CREATION FROM LINEAR NETWORK RAILWAY TRACK MEASUREMENT DATA
[French]
CRÉATION DE POINT DE RÉFÉRENCE DE MESURE DE VOIE À PARTIR DE DONNÉES DE MESURE DE VOIE FERRÉE DE RÉSEAU LINÉAIRE
Applicants **
PRAEDICO, B.V.
Inventors
JAMSHIDI, Ali
SUN, Yiwen
HERRERA HERRERA, Meylin
DE WOLF, Marc
Priority Data
63/585,937
27.09.2023
US
18/898,199
26.09.2024
US
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2419 | |
| EPO | Filing, Examination, Granting | 12213 | |
| Japan | Filing, Examination, Granting | 2392 | |
| South Korea | Filing, Examination, Granting | 2516 | |
| USA | Filing, Examination, Granting | 5140 |

Total:
24,680
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
A computing system may receive first and second linear network railway track measurement data collected during a first track measurement campaign and a second track measurement campaign. The first linear and second network railway track measurement data includes first and second data respectively corresponding to a shape and condition of a geographical segment of track. The computing system may geographically align the first and second linear network railway track measurement data collected during the first and second measurement campaigns using the first and second data corresponding to the shape and condition of the geographical segment of track collected in the first and second measurement campaigns to thereby generate first aligned data.[French]
Un système informatique peut recevoir des première et seconde données de mesure de voie ferrée de réseau linéaire collectées pendant une première campagne de mesure de voie et une seconde campagne de mesure de voie. Les premières et secondes données de mesure de voie ferrée linéaire comprennent des première et seconde données correspondant respectivement à une forme et à une condition d'un segment géographique de voie. Le système informatique peut aligner géographiquement les première et seconde données de mesure de voie ferrée de réseau linéaire collectées pendant les première et seconde campagnes de mesure à l'aide des première et seconde données correspondant à la forme et à l'état du segment géographique de voie collecté dans les première et seconde campagnes de mesure pour ainsi générer des premières données alignées.