WO2025052200 - CONSTRUCTION METHOD AND SYSTEM
National phase entry:
Publication Number
WO/2025/052200
Publication Date
13.03.2025
International Application No.
PCT/IB2024/058122
International Filing Date
21.08.2024
Title **
[English]
CONSTRUCTION METHOD AND SYSTEM
[French]
PROCÉDÉ ET SYSTÈME DE CONSTRUCTION
Applicants **
DHILLON, Inderjit Singh
Inventors
DHILLON, Inderjit Singh
Priority Data
2313646.8
07.09.2023
GB
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter II
* |
| * | |
| * | |
| * | |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2436 | |
| EPO | Filing, Examination, Granting | 10045 | |
| Japan | Filing, Examination, Granting | 2485 | |
| South Korea | Filing, Examination, Granting | 2668 | |
| USA | Filing, Examination, Granting | 8140 |

Total:
25,774
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
A construction method which comprises mounting a cable raising device 26 to a structural column 12, supporting a construction platform 16 from the cable raising device 26 via a cable 32, and elevating the construction platform 16 via raising the cable 32 with the cable raising device 26. The construction platform 16 is then supported by a platform supporting means which is different to the cable raising device 26. The cable raising device 26 can then be dismounted, and a new column 12 installed on top of the previous column 12, with the cable raising device 26 mounted to the new column 12.[French]
L'invention concerne un procédé de construction qui comprend les étapes consistant à : monter un dispositif d'élévation par câble 26 sur une colonne structurale 12, faire soutenir une plateforme de construction 16 par le dispositif d'élévation par câble 26, par l'intermédiaire d'un câble 32, et élever la plateforme de construction 16 par élévation du câble 32 à l'aide du dispositif d'élévation par câble 26. La plateforme de construction 16 est ensuite soutenue par un élément de soutien de plateforme qui est différent du dispositif d'élévation par câble 26. Le dispositif d'élévation par câble 26 peut ensuite être démonté, et une nouvelle colonne 12 installée au-dessus de la colonne précédente 12, le dispositif d'élévation par câble 26 étant monté sur la nouvelle colonne 12.