WO2026027931 - TAUT WIRE SYSTEM FOR A LOAD MANAGEMENT SYSTEM FOR A WIND TURBINE
National phase entry is expected:
Publication Number
WO/2026/027931
Publication Date
05.02.2026
International Application No.
PCT/IB2024/057521
International Filing Date
02.08.2024
Title **
[English]
TAUT WIRE SYSTEM FOR A LOAD MANAGEMENT SYSTEM FOR A WIND TURBINE
[French]
SYSTÈME DE FIL TENDU POUR SYSTÈME DE GESTION DE CHARGE POUR ÉOLIENNE
Applicants **
LIFTOFF HOLDING B.V.
Inventors
MAIJ, Eelko
FICKER, Gerardus Bernardus Franciscus Heleen
VAN SEUMEREN, Johannes Antonius
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1898 | |
| EPO | Filing, Examination, Granting | 8477 | |
| Japan | Filing, Examination, Granting | 2018 | |
| South Korea | Filing, Examination, Granting | 1649 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
18,782
Contact Us
Abstract[English]
A load management system for a wind turbine involves: a lifting device mounted in a nacelle and connectable to a load through a lifting line; and a slew frame connectable to the load when the load is at the nacelle, the slew frame operable to change an orientation of the load when the load is connected to the slew frame and the lifting device. The load management system can further have a taut wire system. The taut wire system involves a frame mounted up-tower in a nacelle, the frame having a plurality of interconnected beams mounted on both longitudinal top beams of the nacelle, the interconnected beams having a wire connector positioned outside the nacelle transversely beyond a sidewall of the nacelle. The taut wire system further has a down-tower tensioning subsystem and at least one tensioned guide wire connected to the frame at the wire connector.[French]
L'invention concerne un système de gestion de charge pour une éolienne. Ledit système de gestion comprend : un dispositif de levage monté dans une nacelle et pouvant être relié à une charge par l'intermédiaire d'une ligne de levage ; et un cadre de pivotement pouvant être relié à la charge lorsque la charge est au niveau de la nacelle, et pouvant fonctionner pour modifier une orientation de la charge lorsque la charge est reliée au cadre de pivotement et au dispositif de levage. Le système de gestion de charge peut en outre comprendre un système de fil tendu. Le système de fil tendu comprend un cadre monté sur une tour dans une nacelle ; le cadre présente une pluralité de poutres interconnectées montées sur les deux poutres supérieures longitudinales de la nacelle ; et les poutres interconnectées comprennent un connecteur de fil positionné à l'extérieur de la nacelle transversalement au-delà d'une paroi latérale de la nacelle. Le système de fil tendu comprend en outre un sous-système de tension de tour vers le bas et au moins un fil de guidage tendu relié au cadre au niveau du connecteur de fil.