WO2023223264 - A DUAL-SHAFT ELECTRIC MOTOR TEST SYSTEM
National phase entry is expected:
Publication Number
WO/2023/223264
Publication Date
23.11.2023
International Application No.
PCT/IB2023/055139
International Filing Date
18.05.2023
Title **
[English]
A DUAL-SHAFT ELECTRIC MOTOR TEST SYSTEM
[French]
SYSTÈME D'ESSAI DE MOTEUR ÉLECTRIQUE À ARBRE DOUBLE
Applicants **
HAMZEHNAVA, Ghodratollah
Inventors
HAMZEHNAVA, Ghodratollah
Priority Data
140150140003001398
18.05.2022
IR
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
IP India
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Natural Person
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2041 | |
| EPO | Filing, Examination, Granting | 8714 | |
| Japan | Filing, Examination, Granting | 2108 | |
| South Korea | Filing, Examination, Granting | 1993 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
19,596
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
A dual-shaft electric motor test system utilizing an upgraded Eddie-Carnet dynamometer is developed. The dual-shaft electric motor test system comprises at least two dynamometers, a sampling unit, a control unit, an electric motor under test, and a test table. For operating a test, a first shaft of the electric motor is connected to a first dynamometer and a second shaft of the electric motor is connected to a second dynamometer such that the first and second shafts of the electric motor can pass through the first dynamometer due to existence of an end-to-end hole in the first dynamometer. A plurality of various components of the test system are placed on the test table and the control unit performs the electric motor test using the received data from the sampling unit and the control software.[French]
Un système d'essai de moteur électrique à arbre double faisant appel à un dynamomètre Eddie-Carnet amélioré est développé. Le système d'essai de moteur électrique à double arbre comprend au moins deux dynamomètres, une unité d'échantillonnage, une unité de commande, un moteur électrique à l'essai, et une table d'essai. Pour mettre en œuvre un essai, un premier arbre du moteur électrique est relié à un premier dynamomètre et un second arbre du moteur électrique est relié à un second dynamomètre, de telle sorte que les premier et second arbres du moteur électrique peuvent passer à travers le premier dynamomètre en raison de l'existence d'un trou de bout en bout dans le premier dynamomètre. Divers composants du système d'essai sont placés sur la table d'essai et l'unité de commande met en œuvre l'essai du moteur électrique à l'aide des données reçues en provenance de l'unité d'échantillonnage et d'un logiciel de commande.